Schedule for Run03-10, 2004

November 30th 1600 - December 2nd, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 11/30/04

 

 

1600-1605

Record XBPM data for user orbit with TopUp running

OPS

Stored Beam

1605-1700

Install high power filter on PAR RF Harmonic #2 & Measure 5th harmonics (WRQ#16459)

Smith/Yao

No Inj.

1605-1700

Testing of software changes for linac (fixedCurrent script) and PAR (PEM standardization issue)

Soliday

No Inj.

1605-1800

Test changes to booster ramp rms/peak calculation routine

Sereno/Varotto

No Booster beam

1700-1900

Operator Training - PAR (1500-2300)

Gagliano

Limited Inj.

1900-2100

Operator Training - SR (1500-2300)

Forth

Stored Beam & Inj.

2100-2400

Bunch purity measurements with PAR bunch cleaning running (parasitic)

Yao/OPS

Stored Beam & Top-UP

2100-2400

Collect beam stability baseline data (0+24*1)

Decker

Stored Beam & Top-up

 

Wednesday, 12/01/04

 

 

0000-0400

Final test of automatic booster ramp correction during top-up (parasitic)

Sereno

Stored Beam & Top-up

0000-0400

Collect beam stability baseline data (0+24*1)

Decker

Stored Beam & Top-up

0400-0600

Operator Training - Booster (2300-0700)

Grodecki

Limited Inj.

0600-0800

Bunch purity set-up

Sereno

Stored Beam & Inj.

0800-0930

Zone A Access to replace rotary encoder on ID in Sector 3 Upstream WRQ#16434

Grimmer

Zone A Access

0800-0930

Zone D Access to replace rotary encoder on ID in Sector 24 Upstream WRQ#16435

Grimmer

Zone D Access

0800-1000

Evaluate ion pump controller/cable/pump VM 25 3IP1 (WRQ#16454)

Gagliano

No Beam

0800-1000

Provide timing signals from iocinjtime to B102 for booster septum magnet microphonic scope trigger. WRQ#16372

Laird

No impact

0830-0930

Identify location and label SR Dipole critical components

Hillman

No Beam

0930-1000

Recovery from Accesses

OPS

Stored Beam & Inj.

0800-1000

Operator Training - Booster (0700-1500)

D. Glenn

Limited Inj.

0945-1000

Removal of High Power Filter on PAR RF

Grelick

No PAR Beam

1000-1200

Operator Training - Linac (0700-1500)

S. Flood/ Simpson

Limited Inj.

1000-1200

SR bunch length studies on 24 singlets

Lumpkin/ Yang/ Sakamoto

Stored Beam & Occ. Inj.

1200-1600

Hybrid Oribt database/Collect xbpm feedforward data

Singh

Stored beam & Inj.

1600-1900

Closed Orbit Measurements

Guo

Stored beam & Occ. Inj

1600-1900

PAR instability study

Yao/Chae

Occ. Inj. possible

1900-2100

Operator Training - SR (1500-2300)

Forth

Stored Beam & Inj.

2100-2300

Operator Training - PAR (1500-2300)

Gagliano

Stored Beam & Inj.

2300-2400

Horizontal local impedance measurements

Sajaev

Stored Beam & Occ. Inj.

 

Thursday, 12/02/04

 

 

0000-0500

Horizontal local impedance measurements

Sajaev

Stored Beam & Occ. Inj.

0500-0700

Operator Training-Booster (2300-0700)

Grodecki

Limited Inj.

0700-0800

Ready for 1+8*7 fill pattern, low emittance, TopUp

OPS

Stored Beam & Injection