Machine Studies

Schedule for Run03-11, 2004

December 7th 1600 - December 8th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 12/07/04

 

 

1600-1605

Record XBPM data for user orbit with TopUp running

OPS

Stored Beam

1605-2200

AC x-ray orbit data collection at ID1 (shutters open)

Singh, ID-1 personnel

Stored Beam & Occ. Inj.

1605-1800

PTB optics tests related to dual-energy

interleaving (PAR beam required)

Borland

Occ. Inj. Possible

1800-2000

2 hours prepare for bunch cleaning with top-up test (PAR beam required)

Yao, Grellick

Inj. Available

1800-2400

Test booster automatic ramp correction

Sereno

Inj. Available

2000-2400

Bunch cleaning with top-up test

Yao, Ops

Stored Beam & Top-Up

 

Wednesday, 12/08/04

 

 

2400-0100

Bunch cleaning with top-up test

Yao, Ops

Stored Beam & Top-Up

0100-0500

Vertical Kicker Induced beam motion (S36 Pinger needed)

Yang/Harkay/Guo

Stored Beam & Occ. Inj.

0500-0700

Operator Training - PAR/Booster/SR (2300-0700) (Injectors only 0630 to 0700)

Gagliano/Forth

Stored Beam & Inj.

0630-0700

Test of Modification to P.S. "Up Double Sector/Conditioning" PEM under normal conditions (no interlock faults)

Soliday

No Beam

0700-0800

Ready for 1+8X7 fill pattern, low emittance, TopUp

OPS

Stored Beam & Injection