Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 11/15/04
|
|
|
0800-0805
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
Stored Beam
|
0805-0900
|
Switch from RF3 and RF4 providing, to RF2 and RF4 providing.
|
Bromberek
|
No Beam
|
0805-0900
|
Continue testing of program to help diagnose problem in iocs1vp
|
Varotto
|
No Beam
|
0805-0830
|
Lower the PAR enclosure temperature
|
Pasky
|
No Impact
|
0805-1200
|
Attempt to close the Harmonic PAR cavity tuner loop
|
Smith/Cherbak/Grelick/Douell
|
1st 2hrs no Inj
|
0830-0900
|
Provide last bunch timing signal from iocinjtime to B107 rack 5
|
Laird
|
No Impact
|
0830-0900
|
Remove three experimental modules from the LIST VXI crate. A reboot is required, which interrupts injection timing. (WRQ#16306)
|
Grelick
|
No Inj
|
0900-0915
|
Booster source drive level measurement
|
Horan
|
No inj.
|
0900-0915
|
Adjustments to RF2 and RF4 to lower the 60Hz-related noise on the SR gap voltage
|
Horan
|
No inj.
|
0900-1000
|
Reboot the following injector iocs: ioclirfgun, iocpar02, iocbvp1, iocbvp3 to add records to compute difference between PS setpoint and readback, for injector kickers and septum PSs.
|
Varotto
|
No Inj
|
0900-1000
|
Reboot iocs33vp to add record to report Bellows temperature.
|
Varotto
|
No Beam
|
0900-1000
|
Reboot IOCS29VP to incorporate new SR vacuum chamber flow PVs
|
Stein
|
No Beam
|
1000-1200
|
Trouble shooting tests on sectors 21 and 28 Ion pump controllers (MPC) invalid readback signals.
|
Quock, Stein, Benes
|
No Impact
|
0900-1200
|
Auto-phase detector testing
|
Lill/Erwin/Sereno/Pasky
|
Limited Injection
|
1200-1330
|
Operator Training - PAR 0800-1500
|
D. Gagliano
|
Limited Inj
|
1330-1500
|
Operator Training - SR 0800-1500
|
Forth
|
Stored Beam & Injection
|
1500-1700
|
Operator Training - Booster 1500-2300
|
D. Glenn
|
Limited Inj.
|
1500-1700
|
Fast Xbpm tests
|
Singh
|
Stored Beam
|
1700-2100
|
SR studies with some sextupoles off
|
Borland/Sajaev
|
Stored Beam & Lim. Inj.
|
1800-2400
|
Training (physics graduate students)
|
Milton/Brandin/Huang
|
Limited injection
|
2100-2400
|
Vertical kicker induced beam motion
|
Yang/Guo/Sajaev
|
Stored Beam & Lim. Inj.
|
|
Tuesday, 11/16/04
|
|
|
2400-0100
|
Vertical kicker induced beam motion
|
Yang/Guo/Sajaev
|
Stored Beam & Lim. Inj.
|
0100-0700
|
Storage Ring Impedance Center Measurements
|
Chae/Yao
|
Stored Beam & Inj.
|
0700-0900
|
Operator Training - PAR 0700-1500
|
D. Gagliano
|
Limited Inj
|
0800-1200
|
Booster Automatic Ramp Correction
|
Sereno
|
Inj Available
|
0900-1100
|
Operator Training - SR 0700-1500
|
Forth
|
Stored Beam & Injection
|
1100-1200
|
Continue testing of Linac P.S. conditioning status records. Must be able to perform conditioning of linac magnets.
|
Varotto
|
Limited Injection
|
1130-1230
|
Reboot IOCLIC2
|
Quock
|
No Inj.
|
1100-1300
|
Observe linac beam energy jitter using one of the analyzing magnets both before and after changing out the Preamp/Phase Shifter Assembly in L2 LLRF rack. The actual swap requires that L2 klystron drive (not modulator) be disabled for less than one hour, disabling linac beam.
|
Grelick, Pasky, Yoder
|
1hrs No Inj
|
1300-1500
|
Verify fundamental loop control in back-up systems & check bunch purity
|
Pasky/Smith Sereno/
|
Stored beam & Inj.
|
1500-1700
|
Operator Training - Booster
|
D. Glenn
|
Limited Inj.
|
1500-1700
|
Narrowband BPM tests
|
Singh
|
Stored Beam
|
1700-2100
|
P1/xbpm tests with RTFB
|
Singh/Decker
|
Stored Beam & Lim. Inj.
|
1700-2100
|
PTB optics
|
Borland
|
Limited Inj.
|
2100-2400
|
Replace and validate S5B:P1 & S36A:P1
|
Singh/Bui
|
Stored Beam & Inj.
|
|
Wednesday, 11/17/04
|
|
|
2400-0100
|
Replace and validate S5B:P1 & S36A:P1
|
Singh/Bui
|
Stored Beam & Inj.
|
0100-0700
|
Injuction pulse RTFB FF waveforms
|
Emery
|
Stored Beam
|
0300-0700
|
PAR instability study with streak camera
|
Yao/Yang
|
Limited Inj
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored Beam & Injection
|