Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 11/23/04
|
|
|
0800-0805
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
Stored Beam
|
0805-0830
|
Configure Linac with L4RF off
|
OPS
|
No Inj
|
0800-0830
|
Install HV power band pass filter on Harmonic Tube Amplifier #1 to test filter @ higher power (Amp #2 is one being used for operation/studies)
|
Smith
|
1st 0.5hrs no Inj
|
0805-0900
|
Troubleshoot ID35 FM2 DP circuit Replace transmitter if necessary (WRQ #16390
|
Swetin
|
No Beam
|
0805-1200
|
Replace seal on L4 water pump
|
Ferry
|
1st 0.5hrs no Inj
|
0805-0930
|
Repair a Gespac Analog readback card in Sector 40 cab 3.
|
Sprau/Vargas
|
No Beam
|
0805-0930
|
Replace a feedback card on the booster rf
|
Cherbak
|
No Inj
|
0805-1100
|
Bunch cleaning studies
|
Yao, Sereno, Grelick
|
1st 1.5hrs no Inj
|
1100-1300
|
Narrowband and X-ray bpm test with RTFB
|
Singh, Decker
|
Stored beam Occ. Inj.
|
1245-1300
|
Remove HV power band pass filter on PAR RF Harmonic Tube Amplifier #1
|
Smith
|
No Inj.
|
1245-1300
|
Reconfigure Linac with L4RF on
|
OPS
|
No Inj.
|
1300-1500
|
Bunch purity studies
|
Sereno
|
Stored Beam & Injection
|
1500-1600
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored Beam & Injection
|