Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Thursday, 11/25/04
|
|
|
0000-0005
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
Stored Beam
|
0000-0200
|
Operator Training - Booster 0000-0700
|
Glenn
|
Limited Inj
|
0200-0400
|
Operator Training - Inj/SR
|
Shultes
|
Stored Beam & Inj.
|
0400-0600
|
Operator Training - Inj/SR
|
Rivera
|
Stored Beam & Inj.
|
0600-1000
|
Test new setpoint calculation method for beta function corrections
|
Sajaev
|
Stored Beam & Inj.
|
1000-1300
|
Find ways to minimize coupling further. Set pinhole resolution from measurement of lifetime.
|
Emery
|
Stored Beam & Occ. Inj.
|
1000-1600
|
PAR instability study with streak Camera
|
Yang, Yao
|
Occ. Inj.
|
1600-1900
|
PAR bunch cleaning study
|
Yao
|
Stored Beam & Inj.
|
1900-2100
|
Operator Training - PAR 1500-2300
|
D. Gagliano
|
Limited Inj
|
2100-2300
|
Operator Training - SR 1500-2300
|
Forth
|
Stored Beam & Injection
|
2300-0000
|
Operator Training - Booster 2300-0700
|
D. Glenn
|
Limited Inj.
|
|
Friday, 11/26/04
|
|
|
0000-0100
|
Operator Training - Booster 2300-0700
|
D. Glenn
|
Limited Inj
|
0100-0300
|
Operator Training SR/Inj
|
Shultes/ Rivera
|
Stored Beam & Injection
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored Beam & Injection
|