Machine Studies

Schedule for Run01-10, 2005

April 4th 0800 - April 6th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 4/4/05

 

 

0800-0805

Collect BPM orbit data

OPS

Stored Beam & Injection

0805-0830

Reboot iocfe6 & iocfe9

M. Smith

 

0805-0820

Reboot interleaving DSPs

Hillman

No Injection

0815-1000

Revise L3 Mode 3 VSWR trip

Grelick

No Beam

0815-0900

SRF Waveguide Switch

Horan

No Beam

0815-0900

iocs25vp work

Stevens

No Beam

0815-1000

Upgrade bpm and fb iocs

Lenkszus/Laird

No Beam

0815-0915

iocs35vp iocs39vp iocpar02 ioclet1bpmwork

Varotto

No Beam

0830-0930

Inspect back scatter beam line

Friedsam

Access Zone F

0830-0930

Install mini camera

Bromberek

Access Zone F

0830-0930

Replace infrared thermometer

Morrison

Access Zone F

0830-0930

Fix SR Dipoles digital readback (water flow)

Puttkammer

No Beam

0830-1230

Replace RG-2 thyratron

Pasky, PS Group

Access Linac

0830-1030

Clean-up and re-arrange PAR bunch cleaning system

Gold, Yao

No impact

0830-0930

Place TLD's for rad measurements

Vacca

Access PAR

1000-1100

9.77 MHz Par bunch cleaning source work

Grelick, Yoder

No Par beam

1000-1130

Test S23 canted undulators

Lenkszus, Fors

No Beam

1000-1030

Set-up RF for phase modulation studies

Horan

No Beam

1000-1130

Document ES:1 & ES:2 configuration

Sprau

No Beam

1230-1300

Recovery from Linac/PAR access

OPS

No Beam

1300-1500

SR Training

D. Gagliano

Stored Beam & Occ. Inj.

1500-1700

SR Training

Glenn

Stored Beam & Occ. Inj.

1700-1900

SR Training

Grodecki

Stored Beam & Occ. Inj.

1900-2400

Short X-ray Pulse measurements w/7-ID

Harkay

Stored Beam & Injc

 

Tuesday, 4/5/05

 

 

0000-0200

BPLD tests

Bui/Pietryla

Stored Beam & Inj.

0200-0600

CPU coupling correction

Emery

Stored Beam

0400-0600

Operator training

S. Flood

Limited Inj

0600-1000

Low BetaX lattice optics corrections

Emery, Sajaev

Stored Beam & Occ. Inj.

0700-1300

PAR Beam Studies

Yao

Occ. Inj. possible

1000-1300

Shielding verification 26-ID

Salazar

Stored beam

1300-1500

X-ray BPM studies

Hahne, Singh

Stored Beam

1500-1700

SR Console Test

D. Glenn

Store Beam & Injection

1700-2300

Phase modulation

Decker

Stored Beam & Inj.

2300-2400

Canted Undulator Steering Tests

Emery, Shang

Stored beam

2330-2400

PAR training

S. Flood

Limited Injection

 

Wednesday, 4/605

 

 

0000-0200

Canted Undulator Steering Tests

Emery, Shang

Stored beam

0000-0130

PAR training

S. Flood

Limited Inj.

0130-0200

Set up for 1296 bunches

OPS

No Inj.

0200-0500

BPM database work with 1296 bunch

Singh

Occ. Inj.

0500-0700

RTFB Tests with 1296 Bunch

Singh, Sun

Stored Beam

0700-0800

Prepare for user Beam

OPS

Stored Beam & Injection