Machine Studies

Draft Schedule for Run01-5, 2005

February 28th 0800 - March 2nd 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 2/28/05

 

 

0800-0805

Collect BPM orbit data

OPS

Store Beam & Injection

0805-0830

Replace VME Board in iocfe05

M. Smith

 

0805-1000

Test new DAC BEK

Fors

No Injection

0805-1000

PAR RF measurements

T. Smith

Limited Injection

0805-1000

Test BIK for drop out problem

Wang

No Injection

0805-0900

Swap out S10B:Q5

Sprau

No Beam

1000-1130

Test RF test cage radiation monitors

Cours/Hillman

No Beam

0805-1100

Reconfigure RFTS WG to Test Set-up

Horan

No Beam

0805-1130

Tune linear encoders

Grimmer

No Beam

0830-1030

Access Linac to test/repair RG2 kicker

PS group

Linac Access

0830-1030

PAR kicker cable length measurements

Morrison

PAR Access

0900-1100

Access Zone D Reset xbpm 26ID

Hahne

Zone D Access

0900-1100

Access Zone D Verify shutters at 26ID

Hawkins

Zone D Access

1100-1300

Test operation of S23 canted undulator correctors

Sprau

No Beam

0930-1100

Access Zone B Reset xbpm 14ID

Hahne

Zone B Access

1000-1015

Reconfigure PAR RF for bunch cleaning

Grelick

Limited Inj

1000-1200

Test FEEPS and PSS at 30ID

Hawkins

No Beam

1015-1115

Access Booster for BTX ODR adjustment

Lumpkin

Booster Access

1030-1130

Test new DAC PSP

Fors

No Injection

1300-1400

Inject beam into SR.

OPS

Stored beam & injection

1400-1800

Topup monitor studies with 24, 324 and 1296 bunches.

Pietryla Bui

Stored beam & injection

1800-2000

SR operator training.

Glenn

Stored beam & injection

2000-2300

324 bunches BPM database work

Singh

Stored Beam & Injection

2000-2300

BTX line tests. Parallel to BPM database work.

Lumpkin

 

2300-2400

BPM tests.

Hahne Singh

Stored Beam & Injection

 

Tuesday, 3/1/05

 

 

0000-0200

BPM tests (continued)

Hahne Singh

Stored Beam & Injection

0000-0200

Operator training - Linac. Parallel to BPM tests.

S. Flood

Limited Inj

0200-0800

Condition 14 singlets, test hybrid with 12 mA.

Borland Emery

Stored Beam & Injection

0800-1200

30ID shielding verification.

Ramanathan

Stored Beam & Injection

0800-1000

Operator training - Linac.

Simpson

Limited Inj

1000-1200

Operator training - Booster.

D. Gagliano

Limited Inj

1200-1600

Setup PAR rf and verify bunch purity.

Sereno Smith Yao

Stored Beam & Injection

1600-2100

Measure X-ray pulse length after vertical kick at 7ID.

Harkay Guo Yang Users

Stored Beam & Injection

2100-2400

ID xbpm alignment scan.

Decker

Stored Beam & Injection

2100-2400

Bunch purity with distorted source. Parallel to xbpm alignment

Yao

Limited Inj

 

Wednesday, 3/2/05

 

 

0000-0300

ID xbpm alignment scan (continued).

Decker

Stored Beam & Injection

0000-0200

Operator training - Linac

S. Flood

Limited Inj

0300-0600

Corrector resolution test.

Lenkszus

Stored Beam & Injection

0600-0700

Test VP IOC reboot procedure

R. Flood & Schroeder

Stored Beam

0700-0800

Prepare for user Beam 0+324*1

OPS

Stored Beam & Injection