Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 2/28/05
|
|
|
0800-0805
|
Collect BPM orbit data
|
OPS
|
Store Beam & Injection
|
0805-0830
|
Replace VME Board in iocfe05
|
M. Smith
|
|
0805-1000
|
Test new DAC BEK
|
Fors
|
No Injection
|
0805-1000
|
PAR RF measurements
|
T. Smith
|
Limited Injection
|
0805-1000
|
Test BIK for drop out problem
|
Wang
|
No Injection
|
0805-0900
|
Swap out S10B:Q5
|
Sprau
|
No Beam
|
1000-1130
|
Test RF test cage radiation monitors
|
Cours/Hillman
|
No Beam
|
0805-1100
|
Reconfigure RFTS WG to Test Set-up
|
Horan
|
No Beam
|
0805-1130
|
Tune linear encoders
|
Grimmer
|
No Beam
|
0830-1030
|
Access Linac to test/repair RG2 kicker
|
PS group
|
Linac Access
|
0830-1030
|
PAR kicker cable length measurements
|
Morrison
|
PAR Access
|
0900-1100
|
Access Zone D Reset xbpm 26ID
|
Hahne
|
Zone D Access
|
0900-1100
|
Access Zone D Verify shutters at 26ID
|
Hawkins
|
Zone D Access
|
1100-1300
|
Test operation of S23 canted undulator correctors
|
Sprau
|
No Beam
|
0930-1100
|
Access Zone B Reset xbpm 14ID
|
Hahne
|
Zone B Access
|
1000-1015
|
Reconfigure PAR RF for bunch cleaning
|
Grelick
|
Limited Inj
|
1000-1200
|
Test FEEPS and PSS at 30ID
|
Hawkins
|
No Beam
|
1015-1115
|
Access Booster for BTX ODR adjustment
|
Lumpkin
|
Booster Access
|
1030-1130
|
Test new DAC PSP
|
Fors
|
No Injection
|
1300-1400
|
Inject beam into SR.
|
OPS
|
Stored beam & injection
|
1400-1800
|
Topup monitor studies with 24, 324 and 1296 bunches.
|
Pietryla Bui
|
Stored beam & injection
|
1800-2000
|
SR operator training.
|
Glenn
|
Stored beam & injection
|
2000-2300
|
324 bunches BPM database work
|
Singh
|
Stored Beam & Injection
|
2000-2300
|
BTX line tests. Parallel to BPM database work.
|
Lumpkin
|
|
2300-2400
|
BPM tests.
|
Hahne Singh
|
Stored Beam & Injection
|
|
Tuesday, 3/1/05
|
|
|
0000-0200
|
BPM tests (continued)
|
Hahne Singh
|
Stored Beam & Injection
|
0000-0200
|
Operator training - Linac. Parallel to BPM tests.
|
S. Flood
|
Limited Inj
|
0200-0800
|
Condition 14 singlets, test hybrid with 12 mA.
|
Borland Emery
|
Stored Beam & Injection
|
0800-1200
|
30ID shielding verification.
|
Ramanathan
|
Stored Beam & Injection
|
0800-1000
|
Operator training - Linac.
|
Simpson
|
Limited Inj
|
1000-1200
|
Operator training - Booster.
|
D. Gagliano
|
Limited Inj
|
1200-1600
|
Setup PAR rf and verify bunch purity.
|
Sereno Smith Yao
|
Stored Beam & Injection
|
1600-2100
|
Measure X-ray pulse length after vertical kick at 7ID.
|
Harkay Guo Yang Users
|
Stored Beam & Injection
|
2100-2400
|
ID xbpm alignment scan.
|
Decker
|
Stored Beam & Injection
|
2100-2400
|
Bunch purity with distorted source. Parallel to xbpm alignment
|
Yao
|
Limited Inj
|
|
Wednesday, 3/2/05
|
|
|
0000-0300
|
ID xbpm alignment scan (continued).
|
Decker
|
Stored Beam & Injection
|
0000-0200
|
Operator training - Linac
|
S. Flood
|
Limited Inj
|
0300-0600
|
Corrector resolution test.
|
Lenkszus
|
Stored Beam & Injection
|
0600-0700
|
Test VP IOC reboot procedure
|
R. Flood & Schroeder
|
Stored Beam
|
0700-0800
|
Prepare for user Beam 0+324*1
|
OPS
|
Stored Beam & Injection
|