Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 3/14/05
|
|
|
0800-0805
|
Collect BPM orbit data
|
OPS
|
Stored Beam & Injection
|
0805-0820
|
Replace a VME module in iocfe01
|
M. Smith
|
No Beam
|
0830-1030
|
Reset XBPM limits
|
Hahne
|
Access Zone D & E
|
0805-1000
|
Upgrade iocs iocs25fb, iocs27fb, iocs29fb, iocs25bpm, iocs27bpm and iocs29bpm
|
Laird
Lenkszus
|
No Beam
|
RF4 phase loop work (RF-4 up)
|
Decker / Horan
|
No Beam
|
Final readiness tests of the PSS and FEEPS at 26ID
|
Hawkins
|
No Beam
|
0805-1000
|
2Hrs Linac Console Test
|
S. Flood
|
No Injection
|
0900-1200
|
PAR RF timing adjustments
|
T. Smith,
C-Y Yao
N. DiMonte
|
No Injection
|
1000-1100
|
Reboot iocruncontrol & test linac PV's
|
Varotto
|
No Injection
|
1000-1200
|
Modify iocmtime
|
Lenkszus
|
No Beam
|
1200-1230
|
Recover the Linac, Booster & SR equipment and store beam in the Ring
|
OPS
|
Recovery
|
1230-1400
|
SR Training.
|
Grodecki
|
Stored Beam & Injection
|
1400-1430
|
Inject single bunch for local impedance
|
Sajaev
|
Stored Beam & Injection
|
1430-2000
|
Optimize bunch quality and bunch cleaning in PAR. SR required during last 2 hours.
|
Yao Yang Sereno
|
Stored Beam & Injection
|
1430-1800
|
Local impedance measurements. Parallel to PAR work.
|
Sajaev
|
Stored beam
|
2000-2300
|
Setup bpm database for hybrid fill.
|
Singh
|
Stored Beam & Injection
|
2200-2300
|
Test BTS x controllaw with another extraction septum. Parallel to bpm database work.
|
Emery Sereno
|
Injection possible
|
2300-2400
|
Bpm and orbit controllaw tests with 1296 bunches.
|
Singh
|
Stored Beam & Injection
|
|
Tuesday, 3/15/05
|
|
|
0000-0100
|
Bpm and orbit controllaw tests with 1296 bunches (continued).
|
Singh
|
Stored Beam & Injection
|
0100-0500
|
14 bunches test.
|
Borland Emery Sajaev
|
Stored Beam & Injection
|
0500-0600
|
Check bunch monitor timing.
|
Emery Lenkszus
|
Stored Beam & Injection
|
0600-0800
|
Troubleshoot drop out problem with BIK controllaw.
|
Wang Fors Hillman
|
Booster beam
|
0800-1200
|
Study L2 power oscillations.
|
Pasky
|
Injection possible
|
0800-1000
|
SR training. Parallel to L2 study.
|
Glenn
|
Stored Beam & Injection
|
1000-1400
|
ID26 shielding verification. First 2 hours parallel to L2 study.
|
Ramanathan
|
Stored Beam & Injection
|
1200-1400
|
PAR training. Parallel to ID26 shielding.
|
Flood
|
Injection possible
|
1400-2000
|
RF phase modulation.
|
Decker Lumpkin Yang Horan
|
Stored Beam & Injection
|
2000-2200
|
SR training.
|
Gagliano
|
Stored Beam & Injection
|
2200-2400
|
Test direct injection with Gun 1.
|
Sereno
|
No injection
|
2200-2400
|
Study vertical decoherence. Parallel to Gun 1 work.
|
Guo Harkay
|
Stored beam
|
|
Wednesday, 3/16/05
|
|
|
0000-0400
|
Test direct injection with Gun 1 (continued).
|
Sereno
|
No injection
|
0400-0700
|
Topup monitor study with hybrid, 24 and 324 bunches.
|
Pietryla Bui
|
Stored Beam & Injection
|
0700-0800
|
Prepare for user Beam
|
OPS
|
Stored Beam & Injection
|