Machine Studies

Schedule for Run01-7, 2005

March 14th 0800 - March 16th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 3/14/05

 

 

0800-0805

Collect BPM orbit data

OPS

Stored Beam & Injection

0805-0820

Replace a VME module in iocfe01

M. Smith

No Beam

0830-1030

Reset XBPM limits

Hahne

Access Zone D & E

 

 

0805-1000

Upgrade iocs iocs25fb, iocs27fb, iocs29fb, iocs25bpm, iocs27bpm and iocs29bpm

Laird

Lenkszus

No Beam

RF4 phase loop work (RF-4 up)

Decker / Horan

No Beam

Final readiness tests of the PSS and FEEPS at 26ID

Hawkins

No Beam

0805-1000

2Hrs Linac Console Test

S. Flood

No Injection

0900-1200

PAR RF timing adjustments

T. Smith,

C-Y Yao

N. DiMonte

No Injection

1000-1100

Reboot iocruncontrol & test linac PV's

Varotto

No Injection

1000-1200

Modify iocmtime

Lenkszus

No Beam

1200-1230

Recover the Linac, Booster & SR equipment and store beam in the Ring

OPS

Recovery

1230-1400

SR Training.

Grodecki

Stored Beam & Injection

1400-1430

Inject single bunch for local impedance

Sajaev

Stored Beam & Injection

1430-2000

Optimize bunch quality and bunch cleaning in PAR. SR required during last 2 hours.

Yao Yang Sereno

Stored Beam & Injection

1430-1800

Local impedance measurements. Parallel to PAR work.

Sajaev

Stored beam

2000-2300

Setup bpm database for hybrid fill.

Singh

Stored Beam & Injection

2200-2300

Test BTS x controllaw with another extraction septum. Parallel to bpm database work.

Emery Sereno

Injection possible

2300-2400

Bpm and orbit controllaw tests with 1296 bunches.

Singh

Stored Beam & Injection

 

Tuesday, 3/15/05

 

 

0000-0100

Bpm and orbit controllaw tests with 1296 bunches (continued).

Singh

Stored Beam & Injection

0100-0500

14 bunches test.

Borland Emery Sajaev

Stored Beam & Injection

0500-0600

Check bunch monitor timing.

Emery Lenkszus

Stored Beam & Injection

0600-0800

Troubleshoot drop out problem with BIK controllaw.

Wang Fors Hillman

Booster beam

0800-1200

Study L2 power oscillations.

Pasky

Injection possible

0800-1000

SR training. Parallel to L2 study.

Glenn

Stored Beam & Injection

1000-1400

ID26 shielding verification. First 2 hours parallel to L2 study.

Ramanathan

Stored Beam & Injection

1200-1400

PAR training. Parallel to ID26 shielding.

Flood

Injection possible

1400-2000

RF phase modulation.

Decker Lumpkin Yang Horan

Stored Beam & Injection

2000-2200

SR training.

Gagliano

Stored Beam & Injection

2200-2400

Test direct injection with Gun 1.

Sereno

No injection

2200-2400

Study vertical decoherence. Parallel to Gun 1 work.

Guo Harkay

Stored beam

 

Wednesday, 3/16/05

 

 

0000-0400

Test direct injection with Gun 1 (continued).

Sereno

No injection

0400-0700

Topup monitor study with hybrid, 24 and 324 bunches.

Pietryla Bui

Stored Beam & Injection

0700-0800

Prepare for user Beam

OPS

Stored Beam & Injection