Machine Studies

Schedule for Run02-10, 2005

August 1st 0800 - August 3rd 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 8/1/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Investigate the unexplained beam losses

Yao/Schroeder

Stored Beam & Injection

0930-1230

Measure and install new cables on the Linac Besocm

Pietryla/ACIS

Access Linac

0930-1030

Refresh SF6 in Linac Zone B&C

Michalek

No beam

0900-1000

Test repaired DSP card in RTFB crate

Lenszus

No beam

0900-1100

Troubleshoot MPC in sector 32/ replace Booster ion pump controller

Quock/Gagliano

No beam

0900-1200

Close harmonic RF loop

Grelick

No beam

0900-0800

Modify control logic for storage ring air conditioning units (continues throughout the study period)

Swetin

May impact beam

0930-1130

Provide PAR Septum timing signal from ICR timing racks to B102 /provide GPS signal to Event

System

Laird

May impact beam

1000-1130

Access 23-BM FE and investigate component alignment

Weimerslage/S&A/Hahne

Authorized Access Zone D

1015-1215

Replace flow meter

Ferry

Access Booster

1200-1400

08:00 - 15:00 PAR Console test (2hrs)

S. Flood

No Injection

1400-1510

08:00 - 15:00 Linac training (2hrs)

Poncin

Limited Injection

1510-1600

Verify switch to Direct Injection

OPS

Limited Injection

1400-1600

26-ID-C Shielding Re-verification (2 hrs between 0600-1800)

Salazar

Stored Beam & Injection

1600-1900

Orbit recovery for 1296 bunch (3 hours/Singh not available for before 1600)

Decker/Singh

Stored Beam & Injection

1900-2100

collect IDxbpm feedforward data with 1296 bunch

Decker/Singh

Stored Beam

2100-0000

Low betax studies for ID8

Borland, Sajaev

Stored Beam & Injection

 

Tuesday, 8/2/05

 

 

2400-0100

Low betax studies for ID8

Borland, Sajaev

Stored Beam & Injection

0100-0600

5 GeV studies with AM source point

(RF Cav. TURBO PUMPS NEEDED)

Yang, Sajaev

Stored Beam & Injection

0700-1100

swap P0 nbbpm filters (any fill pattern)

Bui/Roberts/Singh

Stored Beam

0700-0900

07:00 - 15:00 Linac training (2hrs)

Poncin

Limited Injection

0900-1100

07:00 - 15:00 Booster training (2hrs)

S. Flood

Limited Injection

1100-1700

HOM study - 150mA in 0+24*1 (RF Cav. TURBO PUMPS NEEDED)

 

Harkay, et al

Stored Beam & Injection

1700-2100

Par tuning loop test with beam

Yao, T. Smith, Grelick

Limited injection

1700-2100

XBPM studies (324 fill pattern)

Decker

Stored Beam

2100-2400

RTFB with P0 nbbpm/bmxbpms (any fill)

Singh/Decker

Stored Beam

 

Wednesday, 8/3/05

 

 

0000-0100

RTFB with P0 nbbpm/bmxbpms (any fill)

Singh/Decker

Stored Beam

0100-0700

Collect Top-up Data with Modified front end (various fill patterns - 1296 should be last fill used)

Singh/Bui

Stored Beam & Inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection