Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 8/1/05
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-0900
|
Investigate the unexplained beam losses
|
Yao/Schroeder
|
Stored Beam & Injection
|
0930-1230
|
Measure and install new cables on the Linac Besocm
|
Pietryla/ACIS
|
Access Linac
|
0930-1030
|
Refresh SF6 in Linac Zone B&C
|
Michalek
|
No beam
|
0900-1000
|
Test repaired DSP card in RTFB crate
|
Lenszus
|
No beam
|
0900-1100
|
Troubleshoot MPC in sector 32/ replace Booster ion pump controller
|
Quock/Gagliano
|
No beam
|
0900-1200
|
Close harmonic RF loop
|
Grelick
|
No beam
|
0900-0800
|
Modify control logic for storage ring air conditioning units (continues throughout the study period)
|
Swetin
|
May impact beam
|
0930-1130
|
Provide PAR Septum timing signal from ICR timing racks to B102 /provide GPS signal to Event
System
|
Laird
|
May impact beam
|
1000-1130
|
Access 23-BM FE and investigate component alignment
|
Weimerslage/S&A/Hahne
|
Authorized Access Zone D
|
1015-1215
|
Replace flow meter
|
Ferry
|
Access Booster
|
1200-1400
|
08:00 - 15:00 PAR Console test (2hrs)
|
S. Flood
|
No Injection
|
1400-1510
|
08:00 - 15:00 Linac training (2hrs)
|
Poncin
|
Limited Injection
|
1510-1600
|
Verify switch to Direct Injection
|
OPS
|
Limited Injection
|
1400-1600
|
26-ID-C Shielding Re-verification (2 hrs between 0600-1800)
|
Salazar
|
Stored Beam & Injection
|
1600-1900
|
Orbit recovery for 1296 bunch (3 hours/Singh not available for before 1600)
|
Decker/Singh
|
Stored Beam & Injection
|
1900-2100
|
collect IDxbpm feedforward data with 1296 bunch
|
Decker/Singh
|
Stored Beam
|
2100-0000
|
Low betax studies for ID8
|
Borland, Sajaev
|
Stored Beam & Injection
|
|
Tuesday, 8/2/05
|
|
|
2400-0100
|
Low betax studies for ID8
|
Borland, Sajaev
|
Stored Beam & Injection
|
0100-0600
|
5 GeV studies with AM source point
(RF Cav. TURBO PUMPS NEEDED)
|
Yang, Sajaev
|
Stored Beam & Injection
|
0700-1100
|
swap P0 nbbpm filters (any fill pattern)
|
Bui/Roberts/Singh
|
Stored Beam
|
0700-0900
|
07:00 - 15:00 Linac training (2hrs)
|
Poncin
|
Limited Injection
|
0900-1100
|
07:00 - 15:00 Booster training (2hrs)
|
S. Flood
|
Limited Injection
|
1100-1700
|
HOM study - 150mA in 0+24*1 (RF Cav. TURBO PUMPS NEEDED)
|
Harkay, et al
|
Stored Beam & Injection
|
1700-2100
|
Par tuning loop test with beam
|
Yao, T. Smith, Grelick
|
Limited injection
|
1700-2100
|
XBPM studies (324 fill pattern)
|
Decker
|
Stored Beam
|
2100-2400
|
RTFB with P0 nbbpm/bmxbpms (any fill)
|
Singh/Decker
|
Stored Beam
|
|
Wednesday, 8/3/05
|
|
|
0000-0100
|
RTFB with P0 nbbpm/bmxbpms (any fill)
|
Singh/Decker
|
Stored Beam
|
0100-0700
|
Collect Top-up Data with Modified front end (various fill patterns - 1296 should be last fill used)
|
Singh/Bui
|
Stored Beam & Inj.
|
0700-0800
|
Prepare for User beam
|
OPS
|
Stored Beam & Injection
|