Machine Studies

Schedule for Run02-2, 2005

June 6th 0800 - June 7th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 6/6/05

 

 

0800-0805

Collect xbpm orbit data

Ops

Stored Beam & Injection

0805-0830

Replace cpu on iocs1vp

Varotto

No Beam

0805-0830

Test CPU triggering when switching between modes

M. Smith

No beam

0805-0820

Reboot LET interleaving magnet DSP

Hillman

No injection

0805-0830

Reboot iocacis, iocpar02 & Linac iocs

Quock, Flood

No Injection

0805-1200

install, test with beam, and restore par harmonic rf control circuit (1st & last hour w/o PAR beam)

Yao, Grelick, T. Smith

Occ. Inj.

0900-1100

SR training

Gagliano

Stored Beam & Occ. Inj.

1100-1200

Linac Training

Poncin

Limited Inj.

1200-1400

PAR training (0800-1500)

S. Flood

Limited Inj.

1200-1400

Shielding verification of 26-ID-B

Ramanathan

Stored Beam & Occ. Inj.

1200-1230

Verify BTS corrector degaussing

Varotto

Stored Beam

1400-1800

"Enhanced" (nominally 12mA) hybrid mode w/60s top-up ready for User Ops

Sajaev,Emery Borland, Harkay

Stored beam & Inj.

1800-2200

Custom beta function studies

Borland

Stored beam & Inj.

2200-2400

Decoherence study

Guo, Harkay

Store beam & Inj.

 

Tuesday, 6/7/05

 

 

0000-0200

Develop a correction scheme to correct for differences in rms dI/I when extraction timing is reduced (Parasitic)

Sereno

Injection available

0000-0700

Orbit restore

Singh

Stored beam & Occ. Inj.

0300-0700

Align xbpm /collect feedforward data

Hahne/Singh

Stored beam & Occ. Inj.

0200-0400

Optimize QD and QF ramp correction (parasitic)

Sereno

Injection available

0600-0700

Test rtfb

Xiang/Sun

Stored beam & Occ. Inj.

0400-0600

Linac phase controllaw study (parasitic)

Sereno

Injection available

0700-0800

Prepare for user beam

Ops

Stored Beam & Injection