Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 6/20/05
|
|
|
0000-0010
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0010-0500
|
ID xbpm studies
|
Decker
|
Stored Beam & Occ. Inj.
|
0010-0430
|
Par bunch length measurement and tunerFF optimization
|
Yao
|
Occ. Inj. Available
|
0430-0500
|
Prepare for Linac/PAR Access (Authorized Access, Full LOTO)
|
OPS
|
Linac/PAR Access
|
0500-0630
|
Investigate/repair in-tunnel water leak
|
ME Group
|
Linac/PAR Access
|
0630-0700
|
Recover Linac/PAR beam
|
OPS
|
No injection
|
0500-0700
|
Replace S27 GESPAC
|
Sprau
|
No Beam
|
0500-0630
|
Reboot interleaving DSPs/Standardize interleaving magnets
|
Hillman/ OPS
|
No Injection
|
0600-0700
|
Test L2PM3 hardware (no Linac steering controllaw during this time)
|
Gold
|
|
0630-0700
|
Replace MPCs in sector 32-4 & sector 39-2
|
Vacuum Grp
|
No stored beam
|
0700-0730
|
Connect Johnson Controls for CNM project
|
PFS
|
Possible Impact to Beam
|
0700-0800
|
Prepare for User Beam 0+24*1 Top-Up
|
OPS
|
Stored Beam & Injection
|
0730-0800
|
Collect XBPM orbit data #2
|
OPS
|
Stored Beam & Injection
|