Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 7/4/05
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1200
|
Orbit Recovery with 324 bunch
|
Singh
|
Stored Beam Occ. Inj.
|
0900-1100
|
PAR training (0800-1500)
|
S. Flood
|
Stored Beam & Injection
|
1200-1400
|
SR training (0800-1500)
|
Grodecki
|
Stored Beam & Injection
|
1400-2000
|
Store beam and characerize two low-sigmax option lattices
|
Borland, Emery
|
Stored Beam & Injection
|
2000-2300
|
Store beam and characerize 6 long straight section mock up
|
Borland, Emery
|
Stored Beam & Injection
|
2300-2400
|
Vertical decoherence study (S36 Pinger needed)
|
Guo
|
Stored Beam & Injection
|
|
Tuesday, 7/5/05
|
|
|
0000-0200
|
Vertical decoherence study (continued)
|
Guo
|
Stored Beam & Inj.
|
0200-0600
|
SR training (2300-0700)
|
D. Gagliano
|
D. Gagliano
|
0630-0700
|
Prepare for tunnel access (Full LOTO D&E + S24 canted undulator P.S. LOTOd)
|
OPS
|
No Beam
|
0600-0900
|
Linac phase controllaw studies
|
Sereno
|
Injection available
|
0700-0800
|
swap out one of the 352MHz rf generators (potential P0 errors)
|
Horan
|
Limited Injection
|
0700-0830
|
Test 9.77 and 117.3 MHz source converter
|
Yoder, Grelick
|
No PAR RF
|
0700-0830
|
Swap sector 38 RF cavity 3&4 ion gauge cables
|
RF Group
|
No beam
|
0700-0800
|
Inspect wiring in ACIS racks for UPS work
|
Hogrefe
|
|
0700-0900
|
Replace encoders at S23 & S30
|
Grimmer
|
Access D &E
|
0700-0800
|
Reset 30ID Xbpm Limits, 33ID Xbpm pot replacement
|
Hahne
|
Access E
|
0900-1100
|
SR Qualification Test (0700-1500)
|
Grodecki
|
Stored Beam & Injection
|
0900-1100
|
Linac Training (0700-1500)
|
Poncin
|
Limited Injection
|
1100-1500
|
Shielding verification for 16-BM-B and 26-ID-B
|
Ramanathan
|
Stored Beam & Occ. Inj.
|
1100-1500
|
PAR Beam RF Instability
|
Yao, Chae
|
Occ. Inj. Available
|
1500-1900
|
Align ID XBPMs
|
Decker, Hahne, Roberts
|
Top-Up
|
1900-2300
|
BM xbpm tests in rtfb
|
Decker/Singh
|
Stored beam & Occ. Inj.
|
2300-2400
|
Collect id feedforward data
|
Singh
|
Stored beam Occ. Inj.
|
|
Wednesday, 7/6/05
|
|
|
0000-0100
|
Collect ID feedforward data (continued)
|
|
|
0100-0700
|
Complete work from July 4 using corrected lattices
|
Emery/Sajaev
|
Stored beam & Inj.
|
0700-0800
|
Prepare for User beam - 324 Singlets
|
OPS
|
Stored Beam & Injection
|