Machine Studies

Schedule for Run02-8, 2005

July 18th 0800 - July 20th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 7/18/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1030

Response matrix measurement with S35BM included

Sajaev

Stored Beam

0815-2400

Investigate Linac water seepage

AOD-BLDG

No Injection

0815-0915

Investigate BTS PS conditioning problem

Varotto

No Injection

0815-0900

Replace RF MUX in iocpartune

M. Smith

 

0830-1000

Fix water leak on L2 klystron body water inlet

Cours

No Injection

0830-2000

Bldg. 450 chilled water system valve repair

PFS

 

0830-1130

PAR kicker EMI measurements

Hillman

Controlled Access PAR

0830-0930

Investigate air line connections on L1:PG1:GV1 and L1:PG1:GV2

Hoyt

Access Linac

0830-0930

Replace BSS strobe at gun door

Forrestal

Access Linac

0930-1030

Inspect Booster tunnel for cracks

Russell

Access Booster

0930-1130

Replace IR thermometer

Morrison

Access Booster

1030-1100

Prepare for SR accesses

OPS

No Beam

1100-1400

23BM PSS end to end test

Hawkins

No Beam/Access Zone D

1100-1200

Replace BSS strobe at Zone D maze door

Forrestal

Access Zone D

1130-1430

Set up closed loop for rf12

T. Smith

No Injection

1130-1145

Reboot iocruncontrol

Varotto/OPS

 

1130-1330

Investigate post reboot problem ioclic4

Varotto

No Injection

1200-1300

Troubleshoot failed MPC in sector 32

Quock

No Beam

1300-1400

install new feedback boards at S40 cavities.

Cherbak

No beam

1300-1400

Switch SRF systems

Horan

No Beam

1300-1400

Inspect sector 37 straight section

Morrison

Access Zone F

1400-1500

SR PS PEM testing

Borland, Soliday, Schroeder

No beam

 

Tuesday, 7/19/05

 

 

0000-0200

PAR/Booster training(23:00 - 07:00)

S. Flood

Limited Injection

0200-0400

X-ray BPM studies

Decker

Stored Beam & Injection

0400-0730

IDxbpm alignment studies

Decker/ Hahne

Stored Beam & Injection

0730-0900

SR training

Gagliano

Stored Beam & Injection

0900-1300

Shielding verification of 23BM A and 26IDC stations

Ramanathan

Stored Beam & Occ. Inj.

0900-1100

Linac training (07:00-15:00)

Poncin

Limited Inj.

1100-1400

PAR RF Beam Loading studies

Yao

Limited Inj.

1300-1700

Perform orbit optimization studies

with 34ID

Borland/34ID

Stored Beam & Occ. Inj.

1400-1700

Mapping par rf1 stable region

Yao

Occ. Inj.

1700-1900

SR Console Test

Grodecki

Stored Beam & Injection

1900-2400

Sextupole study for 5GeV lattice

Sajaev

Stored Beam & Inj.

 

Wednesday, 7/20/05

 

 

0000-0400

Single bunch and multibunch instability thresholds with 5 GeV

Harkay

Stored Beam & Inj.

0500-0700

PAR/Booster Training

S. Flood

Limited Injection

0600-0700

Replace failing erratic sector 38 absorber circuit 3 Love controller

Mech. Group

No beam

0700-0800

Prepare for User beam 0+24*1 Top-Up

OPS

Stored Beam & Injection