Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 7/18/05
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1030
|
Response matrix measurement with S35BM included
|
Sajaev
|
Stored Beam
|
0815-2400
|
Investigate Linac water seepage
|
AOD-BLDG
|
No Injection
|
0815-0915
|
Investigate BTS PS conditioning problem
|
Varotto
|
No Injection
|
0815-0900
|
Replace RF MUX in iocpartune
|
M. Smith
|
|
0830-1000
|
Fix water leak on L2 klystron body water inlet
|
Cours
|
No Injection
|
0830-2000
|
Bldg. 450 chilled water system valve repair
|
PFS
|
|
0830-1130
|
PAR kicker EMI measurements
|
Hillman
|
Controlled Access PAR
|
0830-0930
|
Investigate air line connections on L1:PG1:GV1 and L1:PG1:GV2
|
Hoyt
|
Access Linac
|
0830-0930
|
Replace BSS strobe at gun door
|
Forrestal
|
Access Linac
|
0930-1030
|
Inspect Booster tunnel for cracks
|
Russell
|
Access Booster
|
0930-1130
|
Replace IR thermometer
|
Morrison
|
Access Booster
|
1030-1100
|
Prepare for SR accesses
|
OPS
|
No Beam
|
1100-1400
|
23BM PSS end to end test
|
Hawkins
|
No Beam/Access Zone D
|
1100-1200
|
Replace BSS strobe at Zone D maze door
|
Forrestal
|
Access Zone D
|
1130-1430
|
Set up closed loop for rf12
|
T. Smith
|
No Injection
|
1130-1145
|
Reboot iocruncontrol
|
Varotto/OPS
|
|
1130-1330
|
Investigate post reboot problem ioclic4
|
Varotto
|
No Injection
|
1200-1300
|
Troubleshoot failed MPC in sector 32
|
Quock
|
No Beam
|
1300-1400
|
install new feedback boards at S40 cavities.
|
Cherbak
|
No beam
|
1300-1400
|
Switch SRF systems
|
Horan
|
No Beam
|
1300-1400
|
Inspect sector 37 straight section
|
Morrison
|
Access Zone F
|
1400-1500
|
SR PS PEM testing
|
Borland, Soliday, Schroeder
|
No beam
|
|
Tuesday, 7/19/05
|
|
|
0000-0200
|
PAR/Booster training(23:00 - 07:00)
|
S. Flood
|
Limited Injection
|
0200-0400
|
X-ray BPM studies
|
Decker
|
Stored Beam & Injection
|
0400-0730
|
IDxbpm alignment studies
|
Decker/ Hahne
|
Stored Beam & Injection
|
0730-0900
|
SR training
|
Gagliano
|
Stored Beam & Injection
|
0900-1300
|
Shielding verification of 23BM A and 26IDC stations
|
Ramanathan
|
Stored Beam & Occ. Inj.
|
0900-1100
|
Linac training (07:00-15:00)
|
Poncin
|
Limited Inj.
|
1100-1400
|
PAR RF Beam Loading studies
|
Yao
|
Limited Inj.
|
1300-1700
|
Perform orbit optimization studies
with 34ID
|
Borland/34ID
|
Stored Beam & Occ. Inj.
|
1400-1700
|
Mapping par rf1 stable region
|
Yao
|
Occ. Inj.
|
1700-1900
|
SR Console Test
|
Grodecki
|
Stored Beam & Injection
|
1900-2400
|
Sextupole study for 5GeV lattice
|
Sajaev
|
Stored Beam & Inj.
|
|
Wednesday, 7/20/05
|
|
|
0000-0400
|
Single bunch and multibunch instability thresholds with 5 GeV
|
Harkay
|
Stored Beam & Inj.
|
0500-0700
|
PAR/Booster Training
|
S. Flood
|
Limited Injection
|
0600-0700
|
Replace failing erratic sector 38 absorber circuit 3 Love controller
|
Mech. Group
|
No beam
|
0700-0800
|
Prepare for User beam 0+24*1 Top-Up
|
OPS
|
Stored Beam & Injection
|