Machine Studies

Schedule for Run03-10, 2005

December 6th 0800 - December 7th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 12/6/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Characterize PAR RF Fundamental Power Amplifiers

Grelick

Limited SR injection

0810-0930

measure the reference and sensed signal for Booster supplies

Hillman

No Injection

0810-0930

Refresh Linac SF6

Vacuum

No Injection

0830-0930

Install radiation monitoring equipment

Grimmer

Access Zone A

0830-0930

 

Document S21 ACIS/PSS interface hardware

McNamara

Access Zone C

1000-1030

Recover SR beam

OPS

Stored beam & Injection

1030-1100

Perform S37 scraper scan.

Borland

Stored beam & Injection

1100-1300

Investigate phase loop at RF4.

Horan

Stored beam & injection

1300-1500

PAR training

Poncin

Limited SR injection

1500-1700

Booster training

S. Flood

Limited SR injection

1300-1700

Prototype BPM studies (parallel to PAR and Booster training).

Pietryla Decker

Stored beam & injection

1700-1900

PAR RF studies.

Smith Grelick

No injection

1700-1900

Software tests (parallel to PAR RF studies).

Shang Emery

Stored beam

1900-2200

PAR harmonic RF test.

Yao

Limited SR injection

1900-2300

CPU AC mode coupling compensation (first 3 hours parallel to PAR harmonic RF test).

Emery Sajaev

Stored beam & injection

2300-2400

Explore revolution harmonic in tune measurements for hybrid and other bunch patterns.

Emery Sajaev

Stored beam & injection

 

Wednesday, 12/7/05

 

 

0000-0100

Explore revolution harmonic in tune measurements for hybrid and other bunch patterns (continued).

Emery Sajaev

Stored beam & injection

0100-0500

Measure narrow-band BPMs.

X. Sun

Stored beam & injection

0500-0700

Investigate and test S37 BPMs.

Bui

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection