Machine Studies

Schedule for Run03-11, 2005

December 13th 0800 - December 14th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 12/13/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0830-1030

Install a test coil on the PAR RF1 chamber

Putnam

Access PAR

0810-1000

Investigate RF-4 trips

Horan

No beam

0810-1000

PEM testing

Shang, Schroeder

No beam

1030-1100

Recover SR beam

OPS

Stored beam & Injection

1100-1200

Verify Direct Injection.

Jones, OPS

Stored beam & Injection

1200-1400

Setup BPM database for 1296 bunches.

Singh

Stored beam & Injection

1400-1600

AP4/BP4 pffset measurement setup.

Singh Bui

Stored beam & Injection

1600-1700

S37 scraper injection scan.

Borland

Stored beam & Injection

1700-1900

CPU coupling studies.

Emery Sajaev

Stored beam & Injection

1900-2200

Characterize multupacting in PAR fundamental cavity.

Yao

Limited injection

1900-2100

Nb BPM tests. Parallel to PAR rf studies.

Bui Sun

Limited injection

2200-2400

Xbpm studies.

Hahne

Stored beam & Injection

 

Wednesday, 12/14/05

 

 

0000-0200

S38 nb BPM tests.

Pietrryla Decker

Stored beam & Injection

0200-0430

AP4/BP4 offset measurements.

OPS

Stored beam & Injection

0430-0630

Booster training.

Flood

Limited injection

0630-0700

Set-up injectors for direct injection

OPS

Stored Beam & Injection

0700-0800

Test PAR PEM

Soliday

No PAR beam

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection