Schedule for Run03-11, 2005
December 13th 0800 - December 14th 0800
Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/13/05
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0830-1030
|
Install a test coil on the PAR RF1 chamber
|
Putnam
|
Access PAR
|
0810-1000
|
Investigate RF-4 trips
|
Horan
|
No beam
|
0810-1000
|
PEM testing
|
Shang, Schroeder
|
No beam
|
1030-1100
|
Recover SR beam
|
OPS
|
Stored beam & Injection
|
1100-1200
|
Verify Direct Injection.
|
Jones, OPS
|
Stored beam & Injection
|
1200-1400
|
Setup BPM database for 1296 bunches.
|
Singh
|
Stored beam & Injection
|
1400-1600
|
AP4/BP4 pffset measurement setup.
|
Singh Bui
|
Stored beam & Injection
|
1600-1700
|
S37 scraper injection scan.
|
Borland
|
Stored beam & Injection
|
1700-1900
|
CPU coupling studies.
|
Emery Sajaev
|
Stored beam & Injection
|
1900-2200
|
Characterize multupacting in PAR fundamental cavity.
|
Yao
|
Limited injection
|
1900-2100
|
Nb BPM tests. Parallel to PAR rf studies.
|
Bui Sun
|
Limited injection
|
2200-2400
|
Xbpm studies.
|
Hahne
|
Stored beam & Injection
|
|
Wednesday, 12/14/05
|
|
|
0000-0200
|
S38 nb BPM tests.
|
Pietrryla Decker
|
Stored beam & Injection
|
0200-0430
|
AP4/BP4 offset measurements.
|
OPS
|
Stored beam & Injection
|
0430-0630
|
Booster training.
|
Flood
|
Limited injection
|
0630-0700
|
Set-up injectors for direct injection
|
OPS
|
Stored Beam & Injection
|
0700-0800
|
Test PAR PEM
|
Soliday
|
No PAR beam
|
0700-0800
|
Prepare for User beam
|
OPS
|
Stored Beam & Injection
|