Machine Studies

Schedule for Run03-4, 2005

October 24th 0800 - October 26th 0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 10/24/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0830

Check for phase imbalance on cooling skid motor

Ferry

No Beam

0830-1030

Swap out BTX OTR/ODR lens pair

Lumpkin

Access Booster

0830-0930

Troubleshoot/repair Booster C1 IR Unit

Horan

Access Booster

0830-1030

Troubleshoot/repair sector 2 memory scanner

Pietryla

No Beam

0830-1030

Connect and test S24C:H1

Puttkammer Varotto Lenkszus

No Beam

1000-1030

Reboot interleaving supplies

Seglem

No Injection

0900-1030

Datapool IOC work/ RTFB MVE5100 test

Lenkszus

No Beam

0930-1030

Reboot SR IOCs

Varotto

No Beam

0930-1330

Repair RF2 crowbar cabinet lighting

Trento

No Impact

0930-1030

PSS end-to-end test of 12ID

Friedman

No Beam

0930-1030

Test Par rf1 AGC

T. Smith, Yao

No Injection

0830-1030

0800-15:00 2hrs. Linac/PAR training

Poncin

No beam

1030-1100

Recover stored beam

OPS

Stored Beam & Injection

1100-1500

Linac beam phase controllaw testing.

Pasky Erwin

Limited injection

1300-1500

ID steering and datapool software testing. Parallel to linac phase controllaw.

Emery Shang

Limited injection

1500-1700

Condition S37 scraper with different orbits. Parallel to linac phase controlaw

Harkay Emery

Limited injection

1700-2300

Xbpm alignment.

Decker Hahne

Stored beam & injection

2300-2400

Combo lattice beta function correction.

Sajaev

Stored beam & injection

 

Tuesday, 10/25/05

 

 

0000-0300

Combo lattice beta function correction (continued).

Sajaev

Stored beam & injection

0300-0500

OPEN

 

 

0500-0600

PTB MPEOB testing

Hillman

No injection

0600-0700

Recovery of the Injector after MPEOB testing

OPS

No injection

0700-0900

Switch from RF3 to RF2

RF Group

No beam

0700-0900

Linac Console test

Poncin

No injection

0900-1400

Investigate PAR rf1 gap voltage fluctuation.

Smith Dimonte Yao

Stored beam & injection

1400-1500

Collect MV200 data and setup new P0 scope.

Schroeder

Stored beam & Injection

1500-1800

ID34 and ID24 steering optimization.

Emery Shang

Stored beam & injection

1800-2200

Condition S37 scraper with 324 bunches.

Harkay

Stored beam & injection

2200-2400

Study effect of turning off one sextupole.

Emery Sajaev

Stored beam & injection

 

Wednesday, 10/26/05

 

 

0000-0100

Study effect of turining off one sextupole (continued).

Emery Sajaev

Stored beam & injection

0100-0500

Test of improved S37 scraper lattice.

Emery Sajaev

Stored beam & injection

0500-0700

OPEN

 

 

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection