Time |
Descriptions |
Studiers |
SRStatus |
|
Monday, 11/14/05 |
|
|
0800-0810 |
Collect XBPM orbit
data |
OPS |
Stored Beam &
Injection |
0810-1600 |
Investigate SR RF4 problems
(no beam during WG switch) |
RF Group |
Stored Beam &
Top-Up |
0810-0830 |
Reboot the interleaving
supplies. |
Fors |
No Injection |
0810-0830 |
Check and archive SR pulsed
waveforms |
Schroeder |
No Beam |
0830-0845 |
Reboot iocpar02 and
iocruncontrol |
Varotto |
No Beam |
1600-1800 |
Repeat BTX dispersion
measurement. |
Yao |
Stored beam &
injection |
1800-2000 |
Optimize SR bunch
purity. |
Yao |
Stored beam &
injection |
2000-2200 |
PAR training. |
Poncin |
Limited Injection |
2200-2400 |
X-ray bpm studies. Parallel
to PAR training. |
Decker |
Stored beam &
injection |
|
Tuesday, 11/15/05 |
|
|
0000-0400 |
X-ray bpm studies
(continued). |
Decker |
Stored beam &
injection |
0400-0700 |
OPEN |
|
|
0700-1200 |
Replace B:EK Thyratron
tube |
Wang, Gootzen, Jordan |
No injection |
0800-1000 |
Document the differences of
the PAR septum P.S. for the upgrade |
Hillman, Puttkammer |
No injection |
1000-1100 |
Test conditioning
PVs. |
Emery |
No Beam |
1000-1100 |
11BM end to end test |
Friedman |
No Beam |
1000-1200 |
RF waveguide switch/ Set up
RF3 for operation at 80kV. Parallel to Booster training. |
Horan |
No SR Beam |
1000-1200 |
Check S:IK1 thyratron.
Parallel to Booster training. |
Wang |
No SR Beam |
1200-1600 |
Linac beam phase controllaw
study. |
Pasky OAG |
No SR injection |
1600-2200 |
RTFB study. Last hour
parallel to PAR training. |
Decker |
Stored beam &
injection |
2100-2300 |
PAR training. |
Poncin |
Limited Injection |
|
Wednesday,
11/16/05 |
|
|
0000-0300 |
OPEN |
|
|
0300-0700 |
Prototype BPM testing.
Various bunch patterns. |
Pietryla, Emery |
Stored Beam &
Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam &
Injection |