Machine Studies

Schedule for Run03-9, 2005

November 29th 0000 - November 30th 0800

save

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 11/29/05

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Install and test PTB to BTS efficiency calculation in iochdg1

Lenkszus

Limited SR injection

0810-0900

Troubleshoot S14 EPS

McNamara

No Beam

0810-1000

Replace suspect PAR Fundamental VXI Modules

Grelick

No Injection

0810-0900

Switch to SRF-2

Horan

No Injection

0810-0900

Replace RF4 klystron garage fan

Horan

No Injection

0830-1130

Inspect PAR RF couplers

T. Smith

Access PAR

0830-1030

Connect thermocouples on P:IS

Jaski

Access PAR

0830-0930

Inspect Linac chicane

Berg

Access Linac

0810-1000

measure the reference and sensed signal for Booster supplies

Puttkammer

No Injection

1130-1200

Recover SR beam.

OPS

Stored beam & injection

1200-1400

PAR training.

Poncin

Limited injection

1400-1700

PAR RF1 investigation.

Smith Cherbak Yao

Limited injection

1300-1700

RTFB tests. Parallel to PAR training and PAR RF1 investigation.

Singh Decker

Stored beam & injection

1700-1900

Inject 16 mA hybrid fill and recover orbit.

Singh Sajaev

Stored beam & injection

1900-2300

BPM prototype tests.

Pietryla Singh Decker

Stored beam & injection

2300-2400

Symmetric combo lattice.

Borland

Stored beam & injection

 

Wednesday, 11/30/05

 

 

0000-0230

Symmetric combo lattice (continued).

Borland

Stored beam & injection

0230-0330

S37 scraper scan at 100mA with standard lattice.

Borland, Harkay

Stored beam & injection

0330-0600

Benchmark the new cavity HOM probes

Harkay

Stored beam & injection

0600-0700

Switch from RF2 to RF3

RF Group

No beam

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection