Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 11/29/05
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-0900
|
Install and test PTB to BTS efficiency calculation in iochdg1
|
Lenkszus
|
Limited SR injection
|
0810-0900
|
Troubleshoot S14 EPS
|
McNamara
|
No Beam
|
0810-1000
|
Replace suspect PAR Fundamental VXI Modules
|
Grelick
|
No Injection
|
0810-0900
|
Switch to SRF-2
|
Horan
|
No Injection
|
0810-0900
|
Replace RF4 klystron garage fan
|
Horan
|
No Injection
|
0830-1130
|
Inspect PAR RF couplers
|
T. Smith
|
Access PAR
|
0830-1030
|
Connect thermocouples on P:IS
|
Jaski
|
Access PAR
|
0830-0930
|
Inspect Linac chicane
|
Berg
|
Access Linac
|
0810-1000
|
measure the reference and sensed signal for Booster supplies
|
Puttkammer
|
No Injection
|
1130-1200
|
Recover SR beam.
|
OPS
|
Stored beam & injection
|
1200-1400
|
PAR training.
|
Poncin
|
Limited injection
|
1400-1700
|
PAR RF1 investigation.
|
Smith Cherbak Yao
|
Limited injection
|
1300-1700
|
RTFB tests. Parallel to PAR training and PAR RF1 investigation.
|
Singh Decker
|
Stored beam & injection
|
1700-1900
|
Inject 16 mA hybrid fill and recover orbit.
|
Singh Sajaev
|
Stored beam & injection
|
1900-2300
|
BPM prototype tests.
|
Pietryla Singh Decker
|
Stored beam & injection
|
2300-2400
|
Symmetric combo lattice.
|
Borland
|
Stored beam & injection
|
|
Wednesday, 11/30/05
|
|
|
0000-0230
|
Symmetric combo lattice (continued).
|
Borland
|
Stored beam & injection
|
0230-0330
|
S37 scraper scan at 100mA with standard lattice.
|
Borland, Harkay
|
Stored beam & injection
|
0330-0600
|
Benchmark the new cavity HOM probes
|
Harkay
|
Stored beam & injection
|
0600-0700
|
Switch from RF2 to RF3
|
RF Group
|
No beam
|
0700-0800
|
Prepare for User beam
|
OPS
|
Stored Beam & Injection
|