Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 1/24/06
|
|
|
0800-1200
|
sr dc/ac orbit control/configuration tests - stored beam > 80 mA
|
decker/singh/lenkszus/shang
|
Stored Beam
|
0800-1000
|
Operator training - PAR/Booster 0800-1500
|
Poncin
|
Limited Inj
|
1000-1200
|
Investigate B:BM ramp
|
P.S. Group/Sereno
|
Inj. after 1st hour
|
1200-1400
|
Install arc detector at L4
|
Grelick
|
No Inj.
|
1200-1400
|
collect rtfb data
|
Xiang Sun
|
Stored Beam
|
1400-1600
|
Gather data on booster injection controllaws
|
Sereno
|
Injection possible
|
1400-2000
|
measure/install P1 bpm offsets; stored beam > 80 mA; injector reqd
singh/bui
|
Singh/Bui
|
Stored Beam & Inj.
|
1600-2000
|
setup up par beam and bunch cleaning for operation
|
Yao
|
Stored Beam & Inj.
|
2000-2400
|
Validate bplds (id gaps are not be closed until this validation)
|
Bui
|
Stored Beam & Inj.
|
|
Wednesday, 1/25/06
|
|
|
0000-0400
|
Open
|
|
|
0400-1000
|
id xbpms tests (id gaps closed)
|
hahne
|
Stored Beam & Occ. Inj.
|
0400-0800
|
Test linac phase controllaws using a single response matrix
|
Sereno
|
Occ. Inj. possible
|
0600-1000
|
Test new bunch current monitor
|
Lenkszus, Varrotto
|
Stored Beam
|
0800-0900
|
Investigate problem with PAR Fundamental #1
|
Smith
|
No injection
|
0900-1000
|
Operator training - PAR/Booster 0700-1500
|
Poncin
|
Limited Inj.
|
1000-1600
|
orbit recovery w/o new timing scan (1st to fill 324 bunch and then 24 bunch)
|
singh/decker
|
Stored Beam & Injection
|
1600-1800
|
scan and install mpbpm timing
|
singh/decker
|
Stored Beam & Injection
|
1800-2400
|
Establish lower energy limit for 100 mA store.
|
Borland/Emery/Harkay
|
Stored beam & Injection
|
|
Thursday, 1/26/06
|
|
|
0000-0100
|
Check Septum leakage FF waveform
|
Emery
|
Stored beam & injection
|
0100-0300
|
set up orbit for P3/P4 bpm offsets measurement
|
Emery
|
Stored beam & injection
|
0300-0600
|
OPEN
|
|
|
0600-1000
|
Id/bm xbpm alignment with stages
|
hahne/ diag for alignment
|
Stored beam & Occ. Inj.
|
1000-1200
|
Operator training - PAR/Booster 0700-1500
|
Poncin
|
Limited Inj
|
1000-1200
|
collect rtfb data data with new timing scan
|
xiang sun
|
stored beam
|
1000-1300
|
Commissioning of S35 diagnostics with stored beam (35-ID shutter permit needed) - Gap open
|
Yang, Lumpkin
|
Stored Beam
|
1300-1500
|
collect FF data; stored beam with 24 bunch pattern
|
Decker
|
Stored Beam
|
1300-1700
|
OTR and ODR tests at the BTX station.
|
Lumpkin, Yao, Sereno
|
Occ. Inj. Possible
|
1700-1900
|
Operator training - Storage Ring 1500-2300
|
S. Flood
|
Injection, No Stored Beam
|
1900-2300
|
Training - bpm offset measurement/ installation
|
singh/bui/erwin
|
Stored beam & Inj.
|
2300-2400
|
P3/P4 bpm offset measurement
|
ops/diag
|
Stored Beam & Occ. Inj.
|
|
Friday, 1/27/06
|
|
|
0000-0700
|
P3/P4 bpm offset measurement
|
ops/diag
|
Stored Beam & Occ. Inj.
|
0700-0800
|
Dump beam & Prepare for Accesses
|
OPS
|
No beam
|
0730-1200
|
Install cover plates on SR Bake-out Skids
(Utility aisle)
|
Dortwegt/Hoyt
|
No beam
|
0800-1130
|
Repair S35BP1 connection
|
Bui
|
Zone E Access
|
0800-1130
|
Investigate wiring/motor on xbpm stage 34IDP1X
|
Hahne
|
Zone E Access
|
0800-1200
|
PSS validations
|
SI group
|
No beam
|
0800-0900
|
Conditioning validity test.
|
Soliday/Emery
|
No beam
|
0800-0930
|
test the secondary ethernet fail over
on iocfe19, iocfe20, iocid19, & iocid20.
|
M. Smith
|
No impact
|
0830-0900
|
Switch back to Main RF Source
|
Trento
|
No beam
|
0830-1000
|
Add additional windings to PAR RF Multipacting Coil
|
Putnam/ Yao/Pasky
|
PAR Access
|
0830-0900
|
Troubleshoot meter and replace nfrared thermometer read-out meter for coupler ceramic, S37 C1 upstream
|
Morrison
|
No beam
|
0830-0930
|
Investigate low flow indication on 16-ID FM2
|
Swetin
|
Zone B Access
|
0900-1000
|
Test PEM to add device to default configs
|
Shang/Emery/Schroeder
|
No beam
|
1000-1100
|
Test remote attentuation set by Bunch Train
|
Shang/Schroeder
|
No beam
|
0800-1000
|
Install arc detector at L4
|
Grelick
|
No inj
|
0800-1000
|
Record serial #'s for the EMI power supplies in L1 thru L6
|
Bromberek
|
No inj.
|
0900-1200
|
Make and test IOC changes for S21 canted undulator connection to CMPSI card
|
Fors, Lenkszus
|
Fors, Lenkszus
|
1000-1200
|
Various Linac testing
|
Pasky
|
No inj.
|
0900-1130
|
Install radiation detectors
|
Vacca, Ramanathan
|
Zone A Access
|
0900-1130
|
Reset xbpm limits 5IDP2"Y" (-)
|
Hahne
|
Zone A Access
|
1200-1800
|
Tests of scraper 37 protection of ID4.
|
Borland, Emery, Harkay, Ramanathan
|
Stored Beam & Inj.
|
1800-1900
|
Remove radiation detectors
|
Vacca, Ramanathan
|
Zone A Access
|
1900-2100
|
Operator training - Storage Ring 1500-2300
|
S. Flood
|
Injection, No Stored Beam
|
2100-2400
|
id xbpm alignment- top up operation with 24 bunch
|
Decker
|
Stored Beam & Inj.
|
|
Saturday, 1/28/06
|
|
|
0000-0300
|
id xbpm alignment- top up operation with 24 bunch
|
Decker
|
Stored beam & Inj.
|
0300-0700
|
Single bunch instability study
|
Harkay
|
Stored beam & inj.
|
0700-1100
|
Bunch length measurements
|
Sajaev
|
Stored beam & inj.
|
1100-1700
|
Test symetric Combo Lattice
|
Sajaev/Borland
|
Stored beam & Inj.
|
1700-1900
|
Operator training - Storage Ring 1100-2300
|
S. Flood
|
Injection, No Stored Beam
|
1900-2300
|
S35B:P1 est, do offset measurement and
validate.
|
Bui/Singh
|
Stored beam & Inj.
|
2300-2400
|
Operational Orbit control configuration tests-top up 24 bunch fill
|
Singh
|
Stored beam & Inj.
|
|
Sunday, 1/29/06
|
|
|
0000-0200
|
operational orbit control configuration tests-top up 24 bunch fill
|
Singh
|
Stored beam & Inj.
|
0200-0600
|
BPM Offset measurements
|
OPS
|
Stored beam & Inj.
|
0600-1200
|
Synchrobetatron coupling, single bunch, S35 streak camera
|
Harkay, Yang, Guo
|
Stored beam & inj.
|
1200-1800
|
Characterize both PAR rf systems
|
Yao, T. smith
|
No injection
|
1800-2000
|
Operator training - Storage Ring 1100-2300
|
S. Flood
|
Injection, No Stored Beam
|
2000-2400
|
Establish method for ramping from 100mA lower limit to 7GEV with stored beam
|
Borland/Emery
|
Stored beam & Injection
|
|
Monday, 1/30/06
|
|
|
0000-0300
|
Check booster and SR septum jitter and thermal effect.
|
Emery
|
Stored Beam & Inj.
|
0300-0600
|
Check Septum leakage FF waveform
|
Emery
|
Stored Beam & Inj.
|
0600-0900
|
Par current monitor studies
|
Pietryla, Yao, Lenkzsus
|
No injection
|
0900-1100
|
Operator training - PAR/Booster 0700-1500
|
Poncin
|
Limited Inj.
|
1100-1700
|
hard x-ray bpm studies, with 19-ID, shutter permit needed (Must be Monday)
|
Decker
|
Stored beam & occ. inj.
|
1700-2100
|
OTR and ODR tests at the BTX station.#2
|
Lumpkin, Yao, Sereno
|
Occasional inj. possible
|
2100-2300
|
Operator training - Storage Ring 1500-2300
|
S. Flood
|
Injection, No Stored Beam
|
2300-2400
|
beta function correction (must be after good orbit established
|
Sajaev
|
Stored beam & Inj.
|
|
Tuesday, 1/31/06
|
|
|
0000-0200
|
beta function correction (must be after good orbit established
|
Sajaev
|
Stored beam & Inj.
|
0200-0600
|
Investigate methods for increasing vertical emittance without getting a tilt
|
Emery, Sajaev
|
Stored beam & Inj.
|
0600-0700
|
OPEN
|
|
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Store Beam & Injection
|