Machine Studies

Schedule for Run01-10, 2006

April 3rd 0800 - April 5th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 4/3/06

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0845

Test reboot behavior of siocops with RTFB ioc

Varotto

No Beam

0810-0900

End to end test of 11BM

Boron

No Beam

0810-1000

Install ID tags on valves in bakeout system piping

Dortwegt

No Beam

0810-1000

Linac training/requalification

R. Flood

Limited Injection

0810-1000

Install and test FEEPS MPS Chassis at 1BM

McNamara

No Beam

0810-1200

Modify and test the booster septum B:ES1 & B:ES2

Hillman

No Injection

0830-0900

Replace the downstream IR detector at

cavity #3

Bromberek

Access Booster

0830-1200

Validate the Shutters and remove lock's from 24BM

McNamara

Access Zone D

0830-0930

Swap filter comparators

Erwin

Access Zone D

0900-1200

Investigate Par RF1 tuner or phase loop dependency on LIST phase shifter

Grelick/T. Smith/Yao

No injection

0900-1000

Troubleshoot and repair RM10 probe

Vacca

Access Zone F

0900-1000

Replace xbpm translation stage motor

Hahne

Access Zone F

0930-1000

Install radiation dosimetry

Grimmer

Access Zone A

0930-1030

Swap filter comparators

Erwin

Access Zone A

1000-1100

Hook up topup injection signal to scope external trigger input. Test new scope preset.

Emery/Schroeder

No beam

1000-1200

Investigate 360Hz ripple in B:BM

Feng

No Injection

1200-1400

2hrs Booster training

Poncin

Limited Injection

1200-1400

Investigate P1 noise

Singh/Lenkszus/Sun

Stored beam

1400-1600

BPM tests

Erwin

Stored beam

1400-1600

Off-energy studies: PAR and Booster setup

Y.Chae, C.Yao, B.Yang

No injection

1600-2000

Off-energy studies: SR injection & data collection

Y.Chae, C.Yao, B.Yang

Stored beam & Inj.

2000-2200

Booster/SR phase FF studies

Sereno

Stored beam & Inj.

2200-2400

multibunch instability studies.

Need occasional injection, mostly 100 mA.

Harkay/Guo

Stored beam & Occ. Inj.

2200-2400

PTB to booster matching studies

Sereno

Occ. Inj. Possible

 

Tuesday, 4/4/06

 

 

2400-0100

PTB to booster matching studies

Sereno

Occ. Inj. Possible

0000-0300

multibunch instability studies.

Harkay/Guo

Stored beam & Occ. Inj.

0300-0600

OPEN (can be used for BPM offset measurements by OPS)

 

 

0600-0800

Test new SR Bunch Current Monitor (topup with 324 bunches)

Lenkszus/Varotto

Stored beam & Inj.

0800-1600

RHB lattice test with 32-ID and 8-ID users

Borland, Sajaev

Stored beam & Occ. Inj.

1600-1800

RTFB study

Singh/Decker

Stored beam

1800-2200

XBPM alignment

Decker/Diag

Stored beam & Top-Up

2200-2400

Injection characterization. Take SR flag images, install new BTS lattice (possibly). S:IS1 thermal effects.

Emery

Stored beam & Inj.

 

Wednesday, 4/5/06

 

 

0000-0100

Injection characterization. Take SR flag images, install new BTS lattice (possibly). S:IS1 thermal effects.

Emery

Stored beam & Inj.

0100-0400

Implement a FF for H1 V1

Emery

Stored beam & Inj.

0400-0700

OPEN (again can be used for BPM offset measurements by OPS)

 

 

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection