Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 2/7/06
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0830-0930
|
1 hr LTP ControlLaw training
|
LaBuda
|
Injection possible/ No Top Up
|
0810-1000
|
Measure water flows for currently unmonitored flows of pinhole slits and pinhole camera
|
Yang/Dortwegt
|
No beam
|
0810-0830
|
Reboot SR VP IOCs
|
Varotto
|
No Beam
|
0810-1000
|
Install boards/cover plates on bake-out skids (Utility aisle
|
Hoyt/Dortwegt
|
No beam
|
0810-1100
|
B:BM:PS Investigation & testing (may not be able to provide beam during first hour, occasional injections may be possible with notice)
|
P.S. Group/Sereno
|
No injection
|
0810-0915
|
PSS end to end test
|
Friedman
|
No Beam
|
0810-1000
|
Install dosimeters on RF4 troubleshoot RF4 supply temperature
|
Horan
|
No Beam
|
0810-1000
|
xbpm cable pull in ID32
|
Hahne/Gold
|
Beam possible
|
0810-0815
|
Archive SR Kicker and Septum Waveforms
|
OPS
|
No Beam
|
0815-1000
|
Check IK1 timing
|
Hillman
|
No beam
|
0900-1000
|
check conditioning validity PVs.
|
Soliday/Emery
|
No beam
|
0930-1030
|
1 hr Validate EMI supply & adjust L4
|
Pasky/Cours
|
Limited Injection
|
1000-1005
|
Store 102mA
|
OPS
|
Injection needed
|
1000-1200
|
bpms test and training
|
Singh/Diag
|
Stored beam
|
1100-1500
|
test PAR rf12 gap voltage control loop.
|
Grelick, T. Smith, Yao
|
Limited Injection after 1400
|
1400-1700
|
shielding verification of 14-ID-C station and transport (10 ma for 1 hr and 30 ma for two hrs)
|
Ramanathan
|
Stored beam Occ. Inj.
|
1500-1530
|
Test the bunch current baseline pem
|
Yao, Shang
|
Stored beam Occ. inj.
|
1700-2100
|
install new P0 BPM gains
|
Sajaev, Lenkszus, Singh
Vadim
|
Stored beam & injection
|
2100-2400
|
check injection efficiency problems.Aalso take cerenkov data from tek DPO scope
|
Emery/Sajaev
|
Stored beam & Injection
|
|
Wednesday, 2/8/06
|
|
|
0000-0200
|
check CPU correction.
|
Emery
|
Stored Beam
|
0200-0400
|
SR training (2300-0700)
|
S. Flood
|
Stored Beam & Injection
|
0400-0700
|
xbpm data collection
|
Decker
|
Stored beam & Top-Up
|
0700-0800
|
Prepare for User beam
|
OPS
|
Stored Beam & Injection
|