Draft Schedule for Run01-3, 2006

February 14th 0800 - February 15th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 2/14/06

 

 

0800-0810

Collect BPM orbit data

OPS

Stored Beam & Injection

0810-1000

PAR RF feedback loop optimization (need Linac Beam)

T. Smith, Grelick, Cherbak

Occ. Inj. possible

0820-0930

Calibrate the Bergoz (mod-anode current) readback at RF4

Trento

No beam

0830-0930

Test new tests in BRF PEM

Sereno

No injection

0830-0930

Fix S37 thermocouple

Jaski

Access Zone F

0830-0930

Install a temporary video camera in S40

Horan

Access Zone F

0830-0930

26ID end to end test

Friedman

No Beam

0830-0930

Remove RF-4 dosimeters

Horan

No Beam

0930-1100

Collect more dipole ramp correction data

Sereno

Occ. Inj. Possible

0930-1000

Recover SR systems

OPS

Stored Beam & Injection

1000-1200

Shielding verification of 14-ID-C station and transport (50mA for 2 hrs.)

Ramanathan

Stored Beam & Occ. Inj.

1000-1200

Testing Bunch Current Monitor upgrade (bunch current monitor unavailable)

Lenkszus, Varotto

Stored Beam

1100-1200

Redo BTS steering

Emery Sajaev

Limited Inj.

1200-1400

2 hrs. SR training (0800-1300)

S. Flood

Stored Beam & Injection

1400-1600

nbbpm tests

singh/bui

Stored Beam & Inj.

1600-2000

providing reduced beamsize for ID32

Borland, Emery, Sajaev

Stored Beam & Occ. Inj.

1600-1700

Collect booster injection controllaw data for tech note

Sereno

Occ. Inj. possible

1700-2000

Par bunch length measurement with streak camera

Yao, B. Yang, Grelick

Occ. Inj. possible

2000-2200

Injection losses study

Emery, Sajaev

Stored beam & inj.

2200-2400

Xbpm data collection

Decker

Stored beam & Inj.

 

Wednesday, 2/15/06

 

 

0000-0200

Xbpm data collection

Decker

Stored beam & Inj.

0200-0500

Single bunch SR BPM studies

Pietryla

Stored Beam & Inj.

0500-0700

PAR current monitor tests

Pietryla

Occ Inj. Possible

0500-0700

mpbpm/ xbpm tests

singh/hahne/erwin

Stored Beam & Occ. Inj.

0700-0800

Prepare for user operation, 24 singlets, topup.

OPS

Stored Beam & Injection