Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 2/14/06
|
|
|
0800-0810
|
Collect BPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1000
|
PAR RF feedback loop optimization (need Linac Beam)
|
T. Smith, Grelick, Cherbak
|
Occ. Inj. possible
|
0820-0930
|
Calibrate the Bergoz (mod-anode current) readback at RF4
|
Trento
|
No beam
|
0830-0930
|
Test new tests in BRF PEM
|
Sereno
|
No injection
|
0830-0930
|
Fix S37 thermocouple
|
Jaski
|
Access Zone F
|
0830-0930
|
Install a temporary video camera in S40
|
Horan
|
Access Zone F
|
0830-0930
|
26ID end to end test
|
Friedman
|
No Beam
|
0830-0930
|
Remove RF-4 dosimeters
|
Horan
|
No Beam
|
0930-1100
|
Collect more dipole ramp correction data
|
Sereno
|
Occ. Inj. Possible
|
0930-1000
|
Recover SR systems
|
OPS
|
Stored Beam & Injection
|
1000-1200
|
Shielding verification of 14-ID-C station and transport (50mA for 2 hrs.)
|
Ramanathan
|
Stored Beam & Occ. Inj.
|
1000-1200
|
Testing Bunch Current Monitor upgrade (bunch current monitor unavailable)
|
Lenkszus, Varotto
|
Stored Beam
|
1100-1200
|
Redo BTS steering
|
Emery Sajaev
|
Limited Inj.
|
1200-1400
|
2 hrs. SR training (0800-1300)
|
S. Flood
|
Stored Beam & Injection
|
1400-1600
|
nbbpm tests
|
singh/bui
|
Stored Beam & Inj.
|
1600-2000
|
providing reduced beamsize for ID32
|
Borland, Emery, Sajaev
|
Stored Beam & Occ. Inj.
|
1600-1700
|
Collect booster injection controllaw data for tech note
|
Sereno
|
Occ. Inj. possible
|
1700-2000
|
Par bunch length measurement with streak camera
|
Yao, B. Yang, Grelick
|
Occ. Inj. possible
|
2000-2200
|
Injection losses study
|
Emery, Sajaev
|
Stored beam & inj.
|
2200-2400
|
Xbpm data collection
|
Decker
|
Stored beam & Inj.
|
|
Wednesday, 2/15/06
|
|
|
0000-0200
|
Xbpm data collection
|
Decker
|
Stored beam & Inj.
|
0200-0500
|
Single bunch SR BPM studies
|
Pietryla
|
Stored Beam & Inj.
|
0500-0700
|
PAR current monitor tests
|
Pietryla
|
Occ Inj. Possible
|
0500-0700
|
mpbpm/ xbpm tests
|
singh/hahne/erwin
|
Stored Beam & Occ. Inj.
|
0700-0800
|
Prepare for user operation, 24 singlets, topup.
|
OPS
|
Stored Beam & Injection
|