Machine Studies

Draft Schedule for Run01-4, 2006

February 20th 0800 - February 22nd 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, 2/20/06

 

 

0800-0810

Collect BPM orbit data

OPS

Store Beam & Injection

0810-0900

Switch from RF3 to RF2

Horan

No Beam

0900-1100

2hrs SR training

S. Flood

Store Beam & Injection

1100-1330

Install L4 arc detector

Grelick/Yoder

Limited injection

1200-1400

Continue testing of the Bunch Current Monitor upgrade

Lenkszus/Varotto

Stored Beam

1100-1400

Test SR BPMS with stored beam (#1)

Erwin

Stored Beam

1330-1530

PAR RF study address the Fundamental AGC Loop error (daytime requested)

Smith, Grelick, and Cherbak

Occ. Inj. Possible

1400-1500

Test conditioning validity PVs with reboot

Varotto

Stored Beam

1500-1700

shielding verification of 14-ID-B station and transport. (50 ma for two hrs.)

Ramanathan

Stored Beam

1500-1800

booster injection efficiency studies

Sereno

Occasional Injection

1700-1900

Set-Up for ap3/4 offset measurement

Singh/Bui

Stored Beam Occ. Inj.

1800-2100

BTS beamline characterization

Emery

Occ. Inj. possible

1900-2300

Continuation of low-sigmax studies for ID32

Borland,

Sajaev

Stored Beam & Occ. Injection

2100-2200

Test new tune knobs

Emery

Stored beam

2300-2400

RF characterization Studies

Harkay

Stored beam & inj.

 

Tuesday, 2/21/06

 

 

0000-0400

RF characterization Studies (can continue through 0600 if only limited injection needed)

Harkay

Stored beam & inj.

0400-0600

2hrs PAR/Booster training

Poncin

Limited Injection

0600-0630

Turn off 352Mhz RF systems and designated SR P.S.

Ops

No Beam

0600-0630

Reboot FE IOCs

Smith

 

0600-0900

SR BPM troubleshooting

Erwin

No Beam

0630-0700

Turn off Linac/PAR RF & designated injector P.S.

OPS

No beam

0630-0730

Measure S40/C4 resonant frequency-vs-tuner position

Horan

No Beam

0630-0730

Investigate suspected turbo pump interference at S38-40

Horan

No Beam

0700-0800

Recover power supplies to support ComEd work

Puttkammer

No beam

0700-0900

Tie-in & test FEEPS/BLEPS interface @ 23BM

McNamara

No Beam

0700-0730

Reboot Linac, PAR and Booster iocs

Varotto

No Injection

0700-0830

Troubleshoot xbpm flow

Swetin

Access A, B, E & F

0700-0730

Remove dosimeter at 4ID

Merritt

Access Zone A

0700-0800

Align 14ID xbpm

Hahne

Access Zone B

0730-0800

Remove video camera from S40/C4

Horan

Access Zone F

0830-0930

Troubleshoot intermittent mod-anode current trips at RF4

Horan

Injection possible

0830-1030

B:BM thermal instability studies

Puttkammer

No Injection

0900-1000

Par rf pem test

OPS, CY

No Injection

1000-1400

Par bunch length and extraction optimization(Tuesday day, evening)

Yao

Limited Injection

1030-1300

test SR BPMS with stored beam (#2)

Erwin

Stored beam

1300-1800

ID photon bpm alignment (between 0600-1800 if possible -- Decker not avail Tues 1800-22000

Decker, Hahne

Stored beam & Topup

1800-2000

test rtfb configuration

Singh

Stored beam & Occ. Inj.

2000-2400

Continuation of symmetric combo-lattice studies

Borland, Sajaev

Stored Beam & Inj.

 

Wednesday, 2/22/06

 

 

0000-0300

SR injection efficiency

Emery

Stored beam & inj.

0300-0700

Measure ap3/4 offsets

OPS

stored beam Occ. Inj.

0300-0500

2hrs PAR/Booster training

Poncin

Limited Injection

0700-0800

Prepare for user Beam

OPS

Stored Beam & Injection