Machine Studies

Schedule for Run01-5, 2006

February 28th 0800 - March 1st 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 2/28/06

 

 

0800-0810

Collect BPM orbit data

OPS

Store Beam & Injection

0800-1000

PAR training

Poncin

Limited Injection

0810-0830

Scrapedown of storage ring

Harky

No injection

0830-0930

Reboot SR VP IOCs

Varotto

No Beam

0830-0930

Lower XBPM flow setpoints

McNamara

No Beam

0830-0930

Replace S36 RF Cav.1 Tuner Motor

Cherbak

Zone F Access

0900-1000

Replace S14B:P1 Bergosz Module

Bui

No beam

1000-1100

Validate S14 BPLD

Bui

Stored beam & Inj.

1000-1200

Bunch purity measurement with different par configurations

Yao

Stored beam & Inj.

1130-1200

Check PS conditioning validity PVs with reboot

Varotto

Stored beam

1200-1400

14-ID-A shielding verification with about 50 mA closed gap.

Ramanathan

Stored beam

1200-1300

Testing of the Bunch Current Monitor upgrade

Varotto/Lenkszus

Stored beam

1400-1600

324 bunch bpm data base set up

Singh

Stored Beam & inj.

1600-1800

measure intensity dependence in 324 bunch

Bui

Stored beam & Inj.

1800-2200

ID32 low sigmax lattice development

Borland/Sajaev

Stored beam & Occ. Inj.

2200-2400

SR coupling optimation & investigation of coupling readbacks

Emery

Stored beam & Inj.

 

Wednesday, 3/1/06

 

 

0000-0400

CPU check-out

Emery

Stored beam & Occ. Inj.

0400-0700

AP3/4 BPM Offset measurements

OPS

Stored Beam & Occ. Inj.

0700-0800

Prepare for user Beam (0+324*1 -- Non-Top-up)

OPS

Stored Beam & Injection