Machine Studies

Schedule for Run01-7, 2006

March 13th 0800 - March 15th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 3/13/06

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1030

Install the Linac Arc Detector Upgrade at L1

Grelick/Yoder

Limited Injection

0810-0910

Implement software for Booster supplies

Varotto

No Injection

0810-0840

Repair leak on HX in water station L1

Dortwegt

No Injection

0810-0840

Switch from RF2 to RF3

Horan

No Beam

0810-1000

Measure SR kicker trigger timing

Fors

No Beam

0840-1030

Investigate mod-anode OI trip problem at RF4

Horan

No Beam

1030-1230

BPM tests

Erwin

Stored Beam

1030-1230

X-ray BPM tests

Hahne

Stored beam

Cancelled

RFGun Kicker Validation PEMtool test

Pasky, Shang

No injection

Cancelled

Bunch Current Monitor Studies (last 1/2 hour single bunch inj.

Lenkszus, Varotto

Stored beam & 1/2 hr Inj.

1800-2100

Recover 24 singlet orbit

Singh, et al

Stored beam & Inj.

2100-2400

Injection improvement with booster/ BTS adjustments

Sajaev/Sereno/Emery

Stored Beam & Top-Up

 

Tuesday, 3/14/06

 

 

0000-0300

CPU dipole corrector adjustments.

Emery

Stored beam & Injection

0300-0500

Verify top-up with new booster/BTS improvements

OPS

Stored Beam & Top-Up

0500-0600

Verify par setup and SR bunch purity (instructions from Yao)

OPS

Stored Beam & Inj.

0600-0700

Storage Ring training (2300-0700)

S. Flood

Stored Beam & Inj.

0700-0800

Troubleshoot/replace infrared thermometer meter on downstream side of Booster #3 cavity

Morrison/McKenzie

No injection

0700-0900

Waveguide switches to support new RF EPICS setup

Cherbak/DiMonte

No Beam

0800-0900

Bring L3 back on line

Cours/Douell

No Injection

0900-1000

Set-up for 32-ID low sigma lattice

Borland/Sajaev

Stored Beam & Inj.

1000-1600

Test low sigmax lattice with 32-ID

Borland/Sajaev/32ID BP

Stored Beam & Occ. Inj.

1600-1700

Beam size scan vs lifetime

Sajaev

Stored Beam & Inj.

1700-2100

BPM studies

Decker, et al

Stored beam & Occ. Inj.

2100-2300

324 bunch instability investigation

Harkay, Guo, Yang

Stored beam & Occ. Inj

2300-2400

Vertical kick Sector 35 imaging studies

Harkay, Guo, Yang

Stored beam & Inj.

 

Wednesday, 3/15/06

 

 

0000-0300

Vertical kick Sector 35 imaging

Harkay, Guo, Yang

Stored beam & Inj.

0300-0500

Continue with BPM offset measurements if needed

OPS

Stored beam & Occ. Inj.

0500-0700

2hrs Storage Ring Training

S. Flood

Injection possible

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection