Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 3/21/06
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1000
|
Install ID tags on various valves in bakeout system piping in Utility Aisle of SR.
|
Dortwegt
|
No beam
|
0810-1000
|
Begin upgrade Booster/SR septa
|
PS Group
|
No beam
|
0810-0915
|
Refresh SF6 in Zones B&C (L1, L2, & L3 shut down)
|
Hoyt
|
No injection
|
0810-0820
|
Archive Kicker Waveforms
|
OPS
|
No beam
|
0810-1000
|
Parallel-klystron EPICS control development work (RF systems on)
|
RF Group
|
No beam
|
0810-1000
|
SR BPM work
|
Erwin
|
No beam
|
0810-0900
|
install new hardware and databases for PSS 24-BM
|
M. Smith
|
No beam
|
0900-1000
|
check the linear encoders on the ID in sector 26ds (will move gap)
|
M. Smith
|
No beam
|
0915-1000
|
Test PEMtool for RFGun kicker.
|
Pasky/Shang
|
No injection
|
1000-1200
|
SR training (0700-1500)
|
S. Flood
|
Stored Beam & Inj.
|
1200-1400
|
Par RF12 cavity tuner and RF1 LIST phase scan
|
Yao
|
No Injection
|
1200-1400
|
Shielding verification of 14-ID-A station. (50 mA)
|
Ramanathan
|
Stored Beam
|
1200-1400
|
Booster BPM work (includes IOC reboots)
|
Erwin
|
No injection
|
1400-1800
|
booster orbit correction studies
|
Sereno
|
Occ. Inj. available
|
1400-1600
|
investigate P1 AC beam motion measurement in Sector 23,24;29,30
|
Singh/ Lenkszus/
|
Stored beam
|
1400-1430
|
Upgrade bunch cleaning function generator software (Bunch cleaning unavailable)
|
Yao/Norum
|
No impact
|
1600-1800
|
RTFB Studies
|
Singh/Decker
|
Stored Beam
|
1800-2100
|
ID Xbpm scans (324 singlets)
|
Decker
|
Stored Beam & Occ. Inj.
|
1800-2000
|
Booster Training (1500-2300)
|
Poncin
|
Limited Inj.
|
2100-2400
|
Continue studying the 324s mulitbunch instability. S35 diagnostics support required (BM)
|
Harkay, Guo, Yang
|
Stored Beam & Inj.
|
|
Wednesday, 3/22/06
|
|
|
0000-0200
|
Booster/SR injection
|
Emery/Sereno
|
Stored beam & Inj.
|
0200-0400
|
Determine ID perturbation
|
Emery
|
Stored beam
|
0400-0600
|
Bpm studies
|
Erwin
|
Stored beam
|
0500-0600
|
Reboot IOCinjtime (OPS to follow IRMIS reboot instructions)
|
Lenkszus/OPS
|
No injection
|
0600-0700
|
Bunch Current Monitor studies (single bunch injection
|
Lenkszus/Varotto
|
Stored Beam & Inj.
|
0700-0800
|
Prepare for User beam (1+24*1 Top-Up)
|
OPS
|
Stored Beam & Injection
|