Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 7/31/06
|
|
|
0800-0810
|
Collect XBPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1000
|
Fix S:IK2 interlock circuit
|
Wang
|
No Injection
|
0810-1000
|
Linac noise measurements
|
Cours
|
No Injection
|
0810-1000
|
Troubleshoot arcing in RFTS
|
Horan
|
No Beam
|
0900-1000
|
Test Booster BPM self-test
|
Shang
|
No Injection
|
0810-0830
|
Install PECL to TTL coverter
|
Laird
|
No Beam
|
0810-0830
|
Switch from RF2 to RF3
|
RF group
|
No Beam
|
0810-0900
|
PAR PS PEM testing
|
Soliday
|
No Injection
|
0810-0900
|
Test PAR RF amplifier characteristics
|
Smith/Grelick
|
No Injection
|
0830-0900
|
Change FB cables configuration
|
Gold
|
Access Zone A
|
0810-1000
|
Install single bunch feedback cables
|
Stejskal
|
No Impact
|
0830-0930
|
Check 10BP2 BPM cabling
|
Erwin
|
Access Zone B
|
0830-0930
|
Reset 16BMP limits
|
Hahne
|
Access Zone B
|
0930-1000
|
Recover SR systems
|
OPS
|
No Injection
|
1000-1100
|
Steering test of feedback front-end.
|
Yao Gold
|
Stored Beam & Injection
|
1100-1500
|
Corrector feedforward study.
|
Emery
|
Stored Beam & Injection
|
1100-1200
|
Evaluate PAR IK1 kicker mismatch. Parallel to corrector feedforward.
|
Yao
|
Limited injection
|
1200-1300
|
PAR qualification.
|
Pasky
|
Limited injection
|
1500-1800
|
Setup hybrid orbit database.
|
Singh
|
Stored Beam & Injection
|
1800-2000
|
Test bpms with hybrid pattern.
|
Singh Sub
|
Stored Beam & Injection
|
2000-2400
|
Xbpm alignment.
|
Decker
|
Stored Beam & Injection
|
|
Tuesday, 8/1/06
|
|
|
0000-0200
|
Xbpm alignment (continued).
|
Decker
|
Stored Beam & Injection
|
0200-0400
|
SR training.
|
S. Flood
|
Stored Beam & Injection
|
0400-0600
|
PAR requalification.
|
Grodecki
|
No Injection
|
0600-1000
|
BPM testing.
|
Erwin
|
Stored Beam & Injection
|
1000-1200
|
Investigate ID5-ID6 bpm crosstalk.
|
Hahne
|
Stored Beam & Injection
|
1200-1800
|
Single bunch instability threshold characterization.
|
Harkay
|
Stored Beam & Injection
|
1800-2200
|
CPU correction adjustment.
|
Emery
|
Stored Beam & Injection
|
2200-2400
|
Continue stronger sextupoles lattice.
|
Sajaev
|
Stored Beam & Injection
|
|
Wednesday, 8/2/06
|
|
|
0000-0200
|
Continue stronger sextupoles lattice (continued).
|
Sajaev
|
Stored Beam & Injection
|
0200-0400
|
Measure tune slope with current.
|
Sajaev
|
Stored Beam
|
0200-0400
|
Booster training. Parallel to tune slope.
|
LaBuda
|
Limited injection
|
0400-0700
|
Small alpha lattice
|
Sajaev
|
Stored Beam & Injection
|
0700-0800
|
Prepare for User beam
|
OPS
|
Stored Beam & Injection
|