Time
|
Descriptions
|
Studiers
|
SR Status
|
|
Monday, 6/19/06
|
|
|
0800-0810
|
Collect BPM orbit data
|
OPS
|
Store Beam & Injection
|
0810-0830
|
reboot iocs21fb
|
Lenkszus
|
Limited injection
|
0810-0830
|
RF switch to RF3 from RF2
|
Horan
|
No Beam
|
0810-0900
|
Reboot ioclid1,2&3, test mode configurations
|
Varotto, Pasky
|
Limited Injection
|
0900-1100
|
Booster training.
|
Poncin
|
Limited Injection
|
1100-1200
|
Canted undulator steering training.
|
OPS
|
Stored beam & injection
|
1200-1400
|
Linac studies.
|
Pasky
|
No injection
|
1400-1800
|
Investigate booster transport efficiency (1).
|
Sereno
|
Limited Injection
|
1800-2000
|
2hrs SR training
|
S. Flood
|
Stored beam & injection
|
2000-2400
|
Measure coupled SR model and compare with calculations.
|
Sajaev
|
Stored beam & injection
|
|
Tuesday, 6/20/06
|
|
|
0000-0730
|
OPEN
|
|
|
0730-0800
|
Prepare for tunnel access
|
Ops
|
No Beam
|
0730-1100
|
L2 SLED work
|
Bromberek
|
No Injection
|
0800-0900
|
PSS end to end test at 24ID
|
Friedman
|
No Beam
|
0800-0900
|
Replace linac resin tanks
|
Dortwegt
|
No Injection
|
0800-0900
|
Reset xbpm stage limits for 30ID
|
Hahne
|
Access Zone E
|
0800-0900
|
Replace solenoid valve.
|
Ferry
|
|
0800-1000
|
Replace linear encoders in S23 & 24
|
Grimmer
|
Access Zone D
|
0800-1000
|
Cycle shutters at 21ID & 24BM
|
McNamara
|
No Beam
|
0800-1100
|
Measure B:BM voltage ripple and I sensing circuit
|
Puttkammer
|
No Injection
|
0800-1030
|
Hipot RF4 crowbar column/ spotknock RF4 klystron
|
Horan
|
No Beam
|
1030-1100
|
Recover SRRF systems
|
Ops
|
No Beam
|
1100-1400
|
7ID steering optimization.
|
Borland
|
Stored beam & injection
|
1300-1500
|
Booster training. First hour parallel to 7ID steering.
|
Poncin
|
Limited injection
|
1500-2000
|
Investigate booster transport efficiency (2).
|
Sereno
|
Limited Injection
|
2000-2200
|
SR training.
|
S. Flood
|
Stored beam & injection
|
2200-2400
|
Vertical kick optimization for short pulse production.
|
Harkay Yang Spentzouris
|
Stored beam & injection
|
|
Wednesday, 6/21/06
|
|
|
0000-0300
|
Vertical kick optimization for short pulse production (continued).
|
Harkay Yang Spentzouris
|
Stored beam & injection
|
0300-0600
|
Transverse multibunh instability study. Non-standard fill patterns.
|
Harkay
|
Stored beam & injection
|
0600-0800
|
Prepare for user Beam
|
OPS
|
Stored Beam & Injection
|