Machine Studies

Draft Schedule for Run02-4, 2006

June 19th 0800 - June 21st 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, 6/19/06

 

 

0800-0810

Collect BPM orbit data

OPS

Store Beam & Injection

0810-0830

reboot iocs21fb

Lenkszus

Limited injection

0810-0830

RF switch to RF3 from RF2

Horan

No Beam

0810-0900

Reboot ioclid1,2&3, test mode configurations

Varotto, Pasky

Limited Injection

0900-1100

Booster training.

Poncin

Limited Injection

1100-1200

Canted undulator steering training.

OPS

Stored beam & injection

1200-1400

Linac studies.

Pasky

No injection

1400-1800

Investigate booster transport efficiency (1).

Sereno

Limited Injection

1800-2000

2hrs SR training

S. Flood

Stored beam & injection

2000-2400

Measure coupled SR model and compare with calculations.

Sajaev

Stored beam & injection

 

Tuesday, 6/20/06

 

 

0000-0730

OPEN

 

 

0730-0800

Prepare for tunnel access

Ops

No Beam

0730-1100

L2 SLED work

Bromberek

No Injection

0800-0900

PSS end to end test at 24ID

Friedman

No Beam

0800-0900

Replace linac resin tanks

Dortwegt

No Injection

0800-0900

Reset xbpm stage limits for 30ID

Hahne

Access Zone E

0800-0900

Replace solenoid valve.

Ferry

 

0800-1000

Replace linear encoders in S23 & 24

Grimmer

Access Zone D

0800-1000

Cycle shutters at 21ID & 24BM

McNamara

No Beam

0800-1100

Measure B:BM voltage ripple and I sensing circuit

Puttkammer

No Injection

0800-1030

Hipot RF4 crowbar column/ spotknock RF4 klystron

Horan

No Beam

1030-1100

Recover SRRF systems

Ops

No Beam

1100-1400

7ID steering optimization.

Borland

Stored beam & injection

1300-1500

Booster training. First hour parallel to 7ID steering.

Poncin

Limited injection

1500-2000

Investigate booster transport efficiency (2).

Sereno

Limited Injection

2000-2200

SR training.

S. Flood

Stored beam & injection

2200-2400

Vertical kick optimization for short pulse production.

Harkay Yang Spentzouris

Stored beam & injection

 

Wednesday, 6/21/06

 

 

0000-0300

Vertical kick optimization for short pulse production (continued).

Harkay Yang Spentzouris

Stored beam & injection

0300-0600

Transverse multibunh instability study. Non-standard fill patterns.

Harkay

Stored beam & injection

0600-0800

Prepare for user Beam

OPS

Stored Beam & Injection