Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 7/18/06
|
|
|
0800-0810
|
Collect BPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-0815
|
Inject to 102mA, save XrayBPM data
|
OPS
|
Stored Beam & Injection
|
0815-0820
|
Measure chromaticity
|
OPS
|
Stored Beam
|
0815-1000
|
Booster training
|
Poncin
|
Limited Injection
|
0820-0930
|
PSS End to End test @30ID
|
Boron
|
No Beam
|
0820-0900
|
Investigate calorimetry error on RF2
|
Horan
|
No Beam
|
0820-0900
|
Repair leak at RF5/Hybrid #3
|
RF group
|
No Beam
|
0820-1000
|
Reverse hoses on RF4 klystron body circuits. Verify supply/return flowmeter configuration on klystrons RF1, RF3, RF5. Replace RTD in RF2 Klystron return.
|
Swetin
|
No Beam
|
0820-0900
|
Investigate S24C:H1 DAC
|
Fors/Varotto
|
No Beam
|
0840-1030
|
Investigate potential water leak
(time may slip based on findings)
|
Puttkammer
|
Access Zone F
|
1030-1100
|
Inject beam into SR.
|
OPS
|
Stored beam & injection
|
1100-1200
|
Switch back to Bunch Current Monitor used for Operations (will require reboot of IOCSRTUNE)
|
Varotto/ Lenkszus
|
Stored beam
|
1100-1300
|
ID14 shielding verification.
|
Ramanathan
|
Stored beam & injection
|
1300-1500
|
Orbit database work for 24 singlet.
|
Singh
|
Stored beam & injection
|
1500-1700
|
BPM work.
|
Singh
|
Stored beam & injection
|
1700-1800
|
Setup hybrid fill.
|
Sajaev
|
Stored beam & injection
|
1800-1900
|
DCCT testing with hybrid fill.
|
Pietryla
|
Stored beam & injection
|
1900-2100
|
BM xbpm alignment.
|
Hahne
|
Stored beam & injection
|
2100-2400
|
New lattice with lower emittance test.
|
Borland
|
Stored beam & injection
|
|
Wednesday, 7/19/06
|
|
|
0000-0100
|
New lattice with lower emittance test (continued).
|
Borland
|
Stored beam & injection
|
0100-0500
|
Low alpha lattice test.
|
Sajaev
|
Stored beam & injection
|
0500-0700
|
Investigate 5ID-6ID orbit problem.
|
Decker
|
Stored beam & injection
|
0700-0800
|
Prepare for user Beam
|
OPS
|
Stored Beam & Injection
|