Machine Studies

Draft Schedule for Run02-9, 2006

July 25th 0800 - July 26th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 7/25/06

 

 

0800-0810

Collect BPM orbit data

OPS

Stored Beam & Injection

0810-1000

Troubleshoot S:IK4

Puttkammer

No Beam

0810-1000

B:BM 360Hz noise investigation.

Feng

No Injection

0810-0930

PEM testing (Linac & PAR)

Soliday/Yao/Pasky

Limited injection

0830-1030

Investigate IK4 temps

Putnam

Access Zone F

0830-0930

Document S35 PSS/ EPS wiring (contingent on IK4 access)

Budz

Access Zone F

1030-1100

Recover SR systems

Ops

Stored Beam & Injection

1100-1200

Investigate RF-2 trips

Horan

Frequent beam dumps

1200-1400

ID21 shielding verification.

Salazar

Stored Beam & Injection

1200-1400

Booster training. Parallel to shielding verification.

Poncin

Limited Injection

1400-1600

BPM tests.

Singh

Stored Beam & Injection

1600-1800

SR training

S. Flood

Stored Beam & Injection

1800-2000

PAR requalification.

Grodecki

Limited injection

2000-2400

Measure booster emittance in the BTS.

Sereno

Limited injection

 

Wednesday, 7/26/06

 

 

0000-0400

Continue test low alpha lattice.

Sajaev

Stored Beam & Injection

0400-0700

OPEN

 

 

0700-0800

Prepare for user Beam

OPS

Stored Beam & Injection