Machine Studies
Draft Schedule for Run02-9, 2006
July 25th 0800 - July 26th 0800
Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 7/25/06
|
|
|
0800-0810
|
Collect BPM orbit data
|
OPS
|
Stored Beam & Injection
|
0810-1000
|
Troubleshoot S:IK4
|
Puttkammer
|
No Beam
|
0810-1000
|
B:BM 360Hz noise investigation.
|
Feng
|
No Injection
|
0810-0930
|
PEM testing (Linac & PAR)
|
Soliday/Yao/Pasky
|
Limited injection
|
0830-1030
|
Investigate IK4 temps
|
Putnam
|
Access Zone F
|
0830-0930
|
Document S35 PSS/ EPS wiring (contingent on IK4 access)
|
Budz
|
Access Zone F
|
1030-1100
|
Recover SR systems
|
Ops
|
Stored Beam & Injection
|
1100-1200
|
Investigate RF-2 trips
|
Horan
|
Frequent beam dumps
|
1200-1400
|
ID21 shielding verification.
|
Salazar
|
Stored Beam & Injection
|
1200-1400
|
Booster training. Parallel to shielding verification.
|
Poncin
|
Limited Injection
|
1400-1600
|
BPM tests.
|
Singh
|
Stored Beam & Injection
|
1600-1800
|
SR training
|
S. Flood
|
Stored Beam & Injection
|
1800-2000
|
PAR requalification.
|
Grodecki
|
Limited injection
|
2000-2400
|
Measure booster emittance in the BTS.
|
Sereno
|
Limited injection
|
|
Wednesday, 7/26/06
|
|
|
0000-0400
|
Continue test low alpha lattice.
|
Sajaev
|
Stored Beam & Injection
|
0400-0700
|
OPEN
|
|
|
0700-0800
|
Prepare for user Beam
|
OPS
|
Stored Beam & Injection
|