Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Wednesday, 9/27/06
|
|
|
0800-1200
|
sr dc/ac orbit control/configuration tests - stored beam > 80 mA
|
Singh/Shang Lenkszus
|
Stored beam & Injection
|
1200-1400
|
nbbpm tests (all gaps open)
|
Bui
|
Stored beam
|
1200-1400
|
Test Par Harmonic Tube #2 w/Beam
|
Yao/ Grelick
|
Occ. Inj.
|
1400-1800
|
Validate BPLDs
|
Bui
|
Stored beam & Injection
|
1800-2400
|
orbit recovery 24-singlets -- old lattice
|
Singh
|
Stored Beam & Injection
|
|
Thursday, 9/28/06
|
|
|
0000-0400
|
Measure P1 bpm offsets
|
OPS
|
Stored beam & Occ. Inj.
|
0400-0800
|
ID XBPM tests
|
Hahne
|
Stored beam & Inj.
|
0800-1400
|
RF gun kicker validations
|
Pasky
|
No Injection
|
0800-0900
|
Check S37/Cav4 coupler connections (on SR mezzanine)
|
Horan
|
No Beam
|
0800-1600
|
PSS end to end tests
|
Friedman
|
No Beam
|
0800-1300
|
Verify SR vacuum valve EPICS
|
Quock
|
No Beam
|
0830-1030
|
Swap-out Booster SG-J2-CB-J30
|
Kailus
|
No Beam
|
1400-1700
|
Linac PEM Testing
|
Sereno
|
Occ. Inj.
|
1700-1900
|
SR single bunch feedback system data acquisition test
|
Yao
|
Stored beam & inj.
|
1900-2400
|
Lattice correction of RHB lattice (after steering is done by Singh- sector 14 needs steering)
|
Sajaev
|
Stored Beam & Occ. Inj.
|
|
Friday, 9/29/06
|
|
|
0000-0100
|
Lattice correction of RHB lattice
|
Sajaev
|
Stored Beam & Occ. Inj.
|
0100-0600
|
Lower alpha lattice test
|
Sajaev
|
Stored Beam & Inj.
|
0600-0900
|
SR single bunch feedback system drive amplifier test with beam
|
Yao/Gold
|
Stored Beam & Inj.
|
0900-1100
|
Collect RTFB Data
|
Bui
|
Stored Beam & Inj.
|
0900-1300
|
Initial setup of 4 m pinhole camera.
|
Yang
|
Stored Beam
|
1300-1700
|
Xbpm characterization for ID02, ID23 & ID32
|
decker
|
Stored Beam & Occ. Inj.
|
1700-2100
|
develop xbpm FF look up table
|
Decker
|
Stored Beam & Top-Up
|
2100-2400
|
Injection efficiency checkout
|
Emery
|
Stored Beam & Injection
|
|
Saturday, 9/30/06
|
|
|
0000-0100
|
Injection efficiency checkout
|
Emery
|
Stored Beam & Injection
|
0100-0500
|
CPU perturbation checkout
|
Emery
|
Stored Beam & Injection
|
0600-1400
|
orbit recovery with new RHB lattice (after RHB lattice has been tuned)
|
Singh
|
Stored Beam & Inj.
|
1400-1800
|
Characterization of 4 m pinhole camera
|
Yang
|
Stored Beam
|
1400-1700
|
Booster 132nm lattice
|
Sereno
|
Occ. Inj.
|
1800-2400
|
Study effect of gap on instability threshold
|
Harkay, Yang
|
Stored Beam & Injection
|
|
Sunday, 10/1/06
|
|
|
0000-0400
|
Measure P1 Offsets
|
OPS
|
Stored Beam & Injl
|
0400-0700
|
OPEN
|
|
|
0700-1300
|
19ID hard x-ray bpm studies (PS2 shutter open)
|
Decker
|
Stored Beam & Occ. Inj.
|
1300-1600
|
Set up bunch purity system
|
Yang
|
Stored Beam
|
1600-1800
|
set up PAR bunch cleaning system and verify bunch purity
|
Yao
|
Stored Beam & Inj.
|
1800-2400
|
Bunch length vs. rf voltage.
|
Harkay
|
Stored beam & Inj.
|
|
Monday, 10/2/06
|
|
|
0000-0300
|
Calibrate 4-mm pinhole using response matrix
|
Sajaev
|
Stored beam & Injection
|
0300-0600
|
Measure tune slope with current
|
Sajaev
|
Stored beam & Injection
|
0700-0900
|
2hrs. SR training
|
Poncin
|
Limited SR injection
|
0900-1400
|
17ID alignment studies (PS2 shutter open)
|
Decker
|
Stored Beam & Top-Up
|
1400-1700
|
Steering Optimization 14- and 15-ID (PS2 shutter open)
|
Schroeder
|
Stored Beam & Top-Up
|
1700-2100
|
cross-plane response characterization
|
Emery/Xiao
|
Stored Beam & Occ. Inj.
|
2100-2300
|
Corrector FF for ID gap compensation
|
Emery
|
Stored Beam & Occ Inj
|
|
Tuesday, 10/3/05
|
|
|
0100-0100
|
Corrector FF for ID gap compensation
|
Emery
|
Stored Beam & Occ Inj
|
0100-0500
|
Final operational orbit control configuration tests - top up 24 bunch fill with RHB lattice
|
singh/decker
|
Stored Beam & Top-Up
|
0630-0800
|
Prepare for user beam
|
Ops
|
Stored beam & injection
|