Machine Studies

Schedule for Run03-1, 2006

September 27th 0800 - October 3rd 0800

 

Time

Descriptions

Studiers

SRStatus

 

Wednesday, 9/27/06

 

 

0800-1200

sr dc/ac orbit control/configuration tests - stored beam > 80 mA

Singh/Shang Lenkszus

Stored beam & Injection

1200-1400

nbbpm tests (all gaps open)

Bui

 

Stored beam

 

1200-1400

Test Par Harmonic Tube #2 w/Beam

Yao/ Grelick

Occ. Inj.

1400-1800

Validate BPLDs

Bui

Stored beam & Injection

1800-2400

orbit recovery 24-singlets -- old lattice

Singh

Stored Beam & Injection

 

Thursday, 9/28/06

 

 

0000-0400

Measure P1 bpm offsets

OPS

Stored beam & Occ. Inj.

0400-0800

ID XBPM tests

Hahne

Stored beam & Inj.

0800-1400

RF gun kicker validations

Pasky

No Injection

0800-0900

Check S37/Cav4 coupler connections (on SR mezzanine)

Horan

No Beam

0800-1600

PSS end to end tests

Friedman

No Beam

0800-1300

Verify SR vacuum valve EPICS

Quock

No Beam

0830-1030

Swap-out Booster SG-J2-CB-J30

Kailus

No Beam

1400-1700

Linac PEM Testing

Sereno

Occ. Inj.

1700-1900

SR single bunch feedback system data acquisition test

Yao

Stored beam & inj.

1900-2400

Lattice correction of RHB lattice (after steering is done by Singh- sector 14 needs steering)

Sajaev

Stored Beam & Occ. Inj.

 

Friday, 9/29/06

 

 

0000-0100

Lattice correction of RHB lattice

Sajaev

Stored Beam & Occ. Inj.

0100-0600

Lower alpha lattice test

Sajaev

Stored Beam & Inj.

0600-0900

SR single bunch feedback system drive amplifier test with beam

Yao/Gold

Stored Beam & Inj.

0900-1100

Collect RTFB Data

Bui

Stored Beam & Inj.

0900-1300

Initial setup of 4 m pinhole camera.

Yang

Stored Beam

1300-1700

Xbpm characterization for ID02, ID23 & ID32

decker

Stored Beam & Occ. Inj.

1700-2100

develop xbpm FF look up table

Decker

Stored Beam & Top-Up

2100-2400

Injection efficiency checkout

Emery

Stored Beam & Injection

 

Saturday, 9/30/06

 

 

0000-0100

Injection efficiency checkout

Emery

Stored Beam & Injection

0100-0500

CPU perturbation checkout

Emery

Stored Beam & Injection

0600-1400

orbit recovery with new RHB lattice (after RHB lattice has been tuned)

Singh

Stored Beam & Inj.

1400-1800

Characterization of 4 m pinhole camera

Yang

Stored Beam

1400-1700

Booster 132nm lattice

Sereno

Occ. Inj.

1800-2400

Study effect of gap on instability threshold

Harkay, Yang

Stored Beam & Injection

 

Sunday, 10/1/06

 

 

0000-0400

Measure P1 Offsets

OPS

Stored Beam & Injl

0400-0700

OPEN

 

 

0700-1300

19ID hard x-ray bpm studies (PS2 shutter open)

Decker

Stored Beam & Occ. Inj.

1300-1600

Set up bunch purity system

Yang

Stored Beam

1600-1800

set up PAR bunch cleaning system and verify bunch purity

Yao

Stored Beam & Inj.

1800-2400

Bunch length vs. rf voltage.

Harkay

Stored beam & Inj.

 

Monday, 10/2/06

 

 

0000-0300

Calibrate 4-mm pinhole using response matrix

Sajaev

Stored beam & Injection

0300-0600

Measure tune slope with current

Sajaev

Stored beam & Injection

0700-0900

2hrs. SR training

Poncin

Limited SR injection

0900-1400

17ID alignment studies (PS2 shutter open)

Decker

Stored Beam & Top-Up

1400-1700

Steering Optimization 14- and 15-ID (PS2 shutter open)

Schroeder

Stored Beam & Top-Up

1700-2100

cross-plane response characterization

Emery/Xiao

Stored Beam & Occ. Inj.

2100-2300

Corrector FF for ID gap compensation

Emery

Stored Beam & Occ Inj

 

Tuesday, 10/3/05

 

 

0100-0100

Corrector FF for ID gap compensation

Emery

Stored Beam & Occ Inj

0100-0500

Final operational orbit control configuration tests - top up 24 bunch fill with RHB lattice

singh/decker

Stored Beam & Top-Up

0630-0800

Prepare for user beam

Ops

Stored beam & injection