| 
 
Time 
 | 
 
Descriptions 
 | 
 
Studiers 
 | 
 
SRStatus 
 | 
| 
 
  
 | 
 
Tuesday, 10/31/06 
 | 
 
  
 | 
 
  
 | 
| 
 
0800-0810 
 | 
 
Collect XBPM orbit data 
 | 
 
OPS 
 | 
 
Stored Beam & Injection 
 | 
| 
 
0810-0900 
 | 
 
17BM PSS End to End test 
 | 
 
Friedman 
 | 
 
No Beam 
 | 
| 
 
0810-0845 
 | 
 
Check PAR Dipole Card 
 | 
 
PS Group 
 | 
 
No Beam 
 | 
| 
 
0810-0900 
 | 
 
Remove 80Mhz chassis from L3 DMU 
 | 
 
Grelick 
 | 
 
No injection 
 | 
| 
 
0810-0900 
 | 
 
Replace the Memory Scanner in sector 8 VXI crate. 
 | 
 
Erwin/Gold 
 | 
 
No beam 
 | 
| 
 
0810-0845 
 | 
 
Install phase detector card (RF-5) 
 | 
 
Horan 
 | 
 
No injection 
 | 
| 
 
0810-0900 
 | 
 
Switch process water pumps 
 | 
 
Ferry 
 | 
 
No Beam 
 | 
| 
 
0810-0900 
 | 
 
Investigate BB:H3 drift 
 | 
 
Hillman 
 | 
 
Stored Beam & Injection 
 | 
| 
 
0810-0900 
 | 
 
Investigate SIS1 & SIS2 readback issues 
 | 
 
Deriy 
 | 
 
No injection 
 | 
| 
 
0900-1400 
 | 
 
X-ray BPM Studies (24 singlets) 
 | 
 
Decker 
 | 
 
Stored Beam & Top-up 
 | 
| 
 
1400-1500 
 | 
 
SR training (08:00-15:00) 
 | 
 
Poncin 
 | 
 
Stored Beam & Injection 
 | 
| 
 
1500-1900 
 | 
 
Operator requalification 
 | 
 
Schroeder/OPS 
 | 
 
Stored Beam & Injection 
 | 
| 
 
1900-2200 
 | 
 
Orbit Recovery (24 singlet lattice) 
 | 
 
Singh 
 | 
 
Stored Beam & Injection 
 | 
| 
 
2200-2400 
 | 
 
Set-up 324 lattice 
 | 
 
Sajaev/Emery 
 | 
 
Stored Beam 
 | 
| 
 
  
 | 
 
Wednesday, 11/1/06 
 | 
 
  
 | 
 
  
 | 
| 
 
0000-0300 
 | 
 
reduce injection losses at 100 mA 
 | 
 
Sajaev/Emery 
 | 
 
Stored Beam & Injection 
 | 
| 
 
0300-0630 
 | 
 
CPU compensation 
 | 
 
Emery 
 | 
 
Stored Beam 
 | 
| 
 
0630-0800 
 | 
 
Prepare for User beam -- 0+324*1 
 | 
 
OPS 
 | 
 
Stored Beam & Injection 
 |