Time 
 | 
 
Descriptions 
 | 
 
Studiers 
 | 
 
SRStatus 
 | 
| 
 
  
 | 
 
Monday, 11/13/06 
 | 
 
  
 | 
 
  
 | 
| 
 
0800-0810 
 | 
 
Collect XBPM orbit data 
 | 
 
OPS 
 | 
 
Stored Beam & Injection 
 | 
| 
 
0830-1000 
 | 
 
Replace S38/C1 coupler blower 
 | 
 
Horan 
 | 
 
Access Zone F 
 | 
| 
 
0810-0900 
 | 
 
Reboot iocid04b 
 | 
 
M. Smith 
 | 
 
No beam 
 | 
| 
 
0810-0930 
 | 
 
Check K1 relay in S20:21:R1 P.S. 
 | 
 
P.S. Group 
 | 
 
No beam 
 | 
| 
 
0810-0830 
 | 
 
Switch from Rf3 to RF2 
 | 
 
Horan 
 | 
 
No Beam 
 | 
| 
 
0900-1200 
 | 
 
Operator requalification (parasitic) 
 | 
 
Schroeder/ Shultes/Forth 
 | 
 
As available 
 | 
| 
 
1000-1200 
 | 
 
Run tests on RF4 cathode voltage dropouts 
 (No Beam 1000-1100) 
 | 
 
Horan 
 | 
 
Stored beam and Injection 
 | 
| 
 
1200-1600 
 | 
 
Switch to 24 singlets 
 | 
 
Emery/Sajaev 
 | 
 
Stored beam & Injection 
 | 
| 
 
1600-2000 
 | 
 
CPU adjustment 
 | 
 
Emery 
 | 
 
Stored beam & injection 
 | 
| 
 
2000-2400 
 | 
 
Transverse multibunch instability studies 
 | 
 
Harkay/Yang 
 | 
 
Stored beam & injection 
 | 
| 
 
  
 | 
 
Tuesday, 11/14/06 
 | 
 
  
 | 
 
  
 | 
| 
 
0000-0200 
 | 
 
Transverse multibunch instability studies 
 | 
 
Harkay/Yang 
 | 
 
Stored beam & injection 
 | 
| 
 
0200-0800 
 | 
 
OPEN 
 | 
 
  
 | 
 
  
 | 
| 
 
0800-1100 
 | 
 
BPM database for switching to 24 bunch (Top-up needed) 
 | 
 
Singh 
 | 
 
Stored beam & injection 
 | 
| 
 
1100-1300 
 | 
 
Test S8bp0 bpm 
 | 
 
Sun/Singh 
 | 
 
Stored beam 
 | 
| 
 
1300-1500 
 | 
 
SR Operator training 
 | 
 
Poncin 
 | 
 
Stored beam & Injection 
 | 
| 
 
1500-1700 
 | 
 
SR operator requalification 
 | 
 
Schroeder/ Sutton/  Oakley 
 | 
 
Stored beam & Injection 
 | 
| 
 
1700-2000 
 | 
 
SR injection studies with 132nm Booster lattice 
 | 
 
Sereno/Emery 
 | 
 
Stored beam & Injection 
 | 
| 
 
2000-2400 
 | 
 
Try out ID gap FF on correctors 
 | 
 
Emery 
 | 
 
Stored beam & Inj 
 | 
| 
 
  
 | 
 
Wednesday, 11/15/06 
 | 
 
  
 | 
 
  
 | 
| 
 
0000-0630 
 | 
 
BPM Offset measurements (must standardize SR quads after measurement but before 06:30) 
 | 
 
OPS 
 | 
 
Stored beam & injection 
 | 
| 
 
0630-0800 
 | 
 
Prepare for User beam 
 | 
 
OPS 
 | 
 
Stored Beam & Injection 
 |