Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 1/22/07
|
|
|
1100-2400
|
RF conditioning.
|
OPS
|
Stored beam & injection
|
1200-1600
|
SR bpm system shake down test (above 20 mA). Parallel to RF conditioning.
|
Singh Decker
|
Stored beam & injection
|
1600-1800
|
Initial pinhole cameras set up (above 50 mA). Parallel to RF conditioning.
|
Yang
|
Stored beam & injection
|
1800-2200
|
Mpbpm tests (above 20 mA). Parallel to RF conditioning.
|
Erwin Keane
|
Stored beam & injection
|
|
Tuesday, 1/23/07
|
|
|
0000-0700
|
RF conditioning.
|
OPS
|
Stored beam & injection
|
0700-0800
|
Switch to RF3 providing Booster.
|
Horan
|
No Beam
|
0800-1000
|
Operator training - Storage Ring
|
Poncin
|
Stored beam & injection
|
1000-1400
|
SR DC/AC orbit control/configuration tests.
|
Singh Lenkszus Shang
|
Stored beam & injection
|
1000-1100
|
Set up bunch current monitor. Parallel to bpm tests.
|
Varotto
|
Stored beam & injection
|
1400-1800
|
Orbit recovery.
|
Singh
|
Stored beam & injection
|
1800-2000
|
nb bpm test.
|
Sun
|
Stored beam & injection
|
2000-2400
|
Characterization and set up of 4-m pinhole camera for user run.
|
Yang
|
Stored beam & injection
|
|
Wednesday, 1/24/07
|
|
|
0000-0800
|
Measure P1 offsets, validate BPLDs.
|
Bui
|
Stored beam & injection
|
0800-1200
|
Test changes in RTFB and investigate beam losses from last run.
|
Lenkszus Emery Fors
|
Stored beam & injection
|
1200-1400
|
Operator training - Storage Ring.
|
Poncin
|
Stored beam & injection
|
1400-1600
|
BM xbpm tests.
|
Hahne
|
Stored beam & injection
|
1600-2000
|
Verify and set up PAR beam.
|
Yao
|
Limited injection
|
1600-2000
|
ID xbpm tests. Parallel to PAR beam setup.
|
Hahne
|
Limited injection
|
2000-2400
|
Correct beta functions.
|
Sajaev
|
Stored beam & injection
|
|
Thursday, 1/25/07
|
|
|
0000-0400
|
Check lifetime vs tunes.
|
Emery Sajaev
|
Stored beam & injection
|
0400-0800
|
OPEN
|
|
|
0800-1400
|
PSS validations
|
SI group
|
No beam
|
0800-1400
|
Laser Alignment PCgun tune measurement
|
Pasky
|
Access Linac
|
0800-0900
|
Switch to RF-3.
|
RF group
|
No Beam
|
1400-1500
|
Verify RF3 to Booster with beam and switch back to RF-5.
|
Horan
|
|
1500-1700
|
PEM testing with beam.
|
Schroeder
|
Stored beam & injection
|
1700-1900
|
Set up bunch purity measurement system.
|
Yang
|
Stored beam & injection
|
1900-2400
|
Final orbit recovery.
|
Singh
|
Stored beam & injection
|
|
Friday, 1/26/07
|
|
|
0000-0100
|
Final orbit recovery (continued).
|
Singh
|
Stored beam & injection
|
0100-0600
|
Create and test S8 RHB lattice.
|
Sajaev
|
Stored beam & injection
|
0600-1000
|
Check single bunch limits.
|
Sajaev Emery
|
Stored beam & injection
|
1000-1400
|
Linac beam studies.
|
Pasky
|
Limited injection
|
1000-1400
|
xbpm characterization for ID17, ID18, and ID24. Parallel to linac studies.
|
Decker
|
Stored beam & injection
|
1400-1800
|
Final orbit recovery with S8 RHB.
|
Singh
|
Stored beam & injection
|
1800-2000
|
Collect RTFB data.
|
Sun
|
Stored beam & injection
|
2000-2400
|
PAR bpm signal tests.
|
Yao Erwin
|
Stored beam & injection
|
|
Saturday, 1/27/07
|
|
|
0000-0600
|
Multibunch instability study.
|
Harkay
|
Stored beam & injection
|
0600-1000
|
OPEN
|
|
|
1000-1800
|
VW monitor tests.
|
Decker
|
Stored beam & injection
|
1800-2400
|
Power supply testing.
|
Fors
|
|
|
Sunday, 1/28/07
|
|
|
0000-1000
|
OPEN
|
|
|
1000-1400
|
Develop xbpm look up table.
|
Decker
|
Stored beam & injection
|
1400-1800
|
CPU correction.
|
Emery
|
Stored beam & injection
|
1800-2400
|
Verify topup operation.
|
OPS
|
Stored beam & injection
|
|
Monday, 1/29/07
|
|
|
0000-0600
|
Create all-ID RHB lattice (for impedance measurements).
|
Sajaev
|
Stored beam & injection
|
0600-0800
|
OPEN
|
|
|
0800-1200
|
HOM study.
|
Harkay Bromberek
|
Stored beam & injection
|
1200-1400
|
P0 feedback system drive test.
|
Yao
|
Stored beam & injection
|
1400-1800
|
Final operational orbit control configuration tests.
|
Singh Decker
|
Stored beam & injection
|
1800-2200
|
ID gap-corrector feedforward.
|
Emery
|
Stored beam & injection
|
2200-2400
|
mp bpm viewer with various bunch patterns.
|
Emery
|
Stored beam & injection
|
|
Tuesday, 1/30/07
|
|
|
0000-0200
|
mp bpm viewer with various bunch patterns (continued).
|
Emery
|
Stored beam & injection
|
0200-0600
|
Measure tune slope with single bunch.
|
Sajaev
|
Stored beam & injection
|
0600-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Store Beam & Injection
|