Machine Studies
Schedule for Run01-11, 2007
April 10th 0800 – April 11th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 4/10/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
RF radiation surveys (RF1-4) |
RF group |
No beam but RF at full power |
0810-0830 |
Replace DG535 for iocinjtime (ioc may need to be rebooted) |
Lenkszus |
No beam |
0830-0900 |
RF radiation surveys (Injectors) |
RF group |
No beam but RF at full power |
0900-1000 |
RF radiation surveys |
RF group |
Stored beam and Injection |
0810-1000 |
Troubleshooting CMPSI card in sector 35 (1st hour without beam) |
Pietryla |
Stored beam |
0900-1000 |
Test PAR store/scrub |
Jones |
No injection |
1000-1100 |
Test “RMS calculation” top-up required |
Singh/ Lenkszus |
Stored beam and injection |
1100-1400 |
Orbit configuration tests |
Singh |
Stored beam and Occ. Inj. |
1400-1900 |
Apply lattice corrections to hybrid lattice |
Emery, Borland, Sajaev |
Stored beam and injection |
1900-2100 |
Run ID gap feedforward with run Control |
Emery |
Stored beam |
1900-2100 |
PC Gun studies |
Sereno/Pasky |
No injection |
2100-2400 |
Single bunch parameter measurement |
Chae, Yang, Yao, Emery |
Stored beam & injection |
|
Wednesday, 4/11/07 |
|
|
0000-0300 |
Single bunch parameter measurement |
Chae, Yang, Yao, Emery |
Stored beam & injection |
0300-0700 |
19ID Hard X-ray BPM studies (shutter permit needed) |
Decker/ Rosenbaum |
Stored beam & periodic injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |