Schedule for Run01-12, 2007
April 17th 0800 - April 17th 2400
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 4/17/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Investigate PAR dipole current fluctuations. |
PS group Yao |
No injection |
0810-0900 |
Standardize to last 24 bunches file and inject 100 mA at 0900. |
OPS |
|
0900-1300 |
PC gun studies. |
Sereno |
No Injection |
0900-1100 |
P0 feedback data acquisition test. Parallel to PC gun studies. |
Yao |
Stored beam |
1100-1300 |
Test ID gap FF with new runcontrol PVs. Parallel to PC gun studies. |
Emery |
Stored beam |
1300-1500 |
Study microwave instability. |
Chae Yao |
Stored beam & injection |
1500-1700 |
Accumulation limit study. |
Emery Chae |
Stored beam & injection |
1700-2100 |
S37 vacuum and instability study and other instability stuff. |
Harkay |
Stored beam & injection |
2100-2400 |
ILC damper bunch distribution in APS. |
Harkay |
Stored beam & injection |