Machine Studies
Draft Schedule for Run01-3, 2007
February 13th 0800 - February 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 2/13/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0830 |
Switch water pump for S33/34 |
Ferry |
No Beam |
0810-0900 |
Install P0 feedback system amplifiers |
Yao |
No Impact to studies |
0810-0900 |
PEM testing |
Schroeder |
No beam |
0810-1000 |
Troubleshoot RF3 auxiliary ion pump controller circuit. |
RF group |
No beam |
0810-0900 |
Replace VME board in iocid12. |
Smith |
No beam |
1000-1030 |
Recover SR beam. |
OPS |
Stored beam & injection |
1030-1100 |
ID32 shielding verification with 50 mA. |
Ramanathan |
Stored beam & injection |
1030-1100 |
Test power cycling of linux server for bunch current monitor. Parallel to shielding verification. |
Varotto |
Stored beam & injection |
1100-1300 |
Linac beam study. |
Pasky |
Injection on request |
1100-1300 |
Measure SR DCCT frequency spectrum with different fill patterns. Parallel to linac beam study. |
Pietryla |
Stored beam & injection |
1300-1600 |
Create reference lattice with beam centered everywhere. |
Sajaev Emery |
Stored beam & injection |
1600-1800 |
Bpm tests. |
Singh |
Stored beam & injection |
1600-1800 |
PAR bpm tests. Parallel to orbit recovery. |
Yao |
Injection on request |
1800-2000 |
Test P0 feedback drive. |
Yao |
Stored beam & injection |
2000-2200 |
9-m pin-hole steering optimization. |
Emery Yang |
Stored beam & injection |
2200-2400 |
Xbpm gap scans. |
Decker |
Stored beam & injection |
|
Wednesday, 2/14/07 |
|
|
0000-0400 |
Xbpm gap scans (continued). |
Decker |
Stored beam & injection |
0400-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |