Machine Studies
Draft Schedule for Run01-4, 2007
February 19th 0800 - February 21st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, 2/19/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Switch from RF2/RF4 to RF3/RF4 |
Cours |
No Beam |
0810-1000 |
Repair faulty analog read backs |
Puttkammer |
No Beam |
0810-1200 |
Match electrical length of amplifiers |
Yao |
No Impact to studies |
0830-0930 |
Replace failed strobe |
Forrestal |
Access Linac/PAR |
0830-0930 |
Map waveguide run |
Grelick |
Access Linac/PAR |
0830-0930 |
Measure limit switches for covers |
Theres |
Access Linac/PAR |
1000-1100 |
Test PAR septum changes |
Hillman, Varotto |
Limited Injection |
0930-1000 |
Recover Linac/PAR |
OPS |
Limited injection |
1000-1200 |
ID32 shielding verification. |
Salazar |
Stored Beam & Injection |
1000-1015 |
Test power cycling of the linux server. |
Varotto |
Bunch current monitor unavalable |
1200 |
Inject 102 mA. |
OPS |
|
1200-1600 |
Linac study with PC gun. |
Pasky |
No injection |
1200-1400 |
Test switch between SR orbit controllaw. Parallel to linac study. |
Shang |
Stored beam |
1200-1300 |
SR pulsed supplies PEM testing. Parallel to linac study. |
Soliday |
Stored beam |
1300-1500 |
Investigate P3BMT1 & L5:QM4. Parallel to linac study. |
Hillman |
No injection |
1600-1700 |
Setup and vrify bunch cleaning system. |
Gold Yao |
Stored Beam & Injection |
1700-2000 |
Test P0 feedback drive. |
Gold Yao |
Stored Beam & Injection |
2000-2400 |
CPU correction. |
Emery |
Stored Beam & Injection |
|
Tuesday, 2/20/07 |
|
|
0000-0400 |
Characterize AC noise at P0/P1 bpms. |
Singh Sun |
Stored Beam & Injection |
0400-0700 |
Switch to K1 and K2 down modes. |
Sereno |
No injection |
0700-1300 |
Xbpm alignment. |
Decker Hahne |
Stored Beam & Injection |
0900-1100 |
Work on BTS bpms. Parallel to xbpm alignment. |
Erwin |
No effect on anything |
1100-1300 |
Work on PTB:V3 bpm. Parallel to xbpm alignment. |
Erwin |
No effect on anything |
1300-1500 |
Troubleshoot S32A:P3 bpm. |
Erwin |
Stored Beam & Injection |
1500-1900 |
FF feedforward. |
Emery |
Stored Beam & Injection |
1500-1700 |
Test PAR bpms. Parallel to FF feedforward. |
Erwin |
Injection possible |
1900-2300 |
Continue setting up reference lattice. |
Emery Sajaev |
Stored Beam & Injection |
2300-2400 |
Continue “All ID RHB” lattice. |
Sajaev |
Stored Beam & Injection |
|
Wednesday, 2/21/07 |
|
|
0000-0300 |
Continue “All ID RHB” lattice (continued). |
Sajaev |
Stored Beam & Injection |
0300-0700 |
Setup S8 RHB hybrid lattice. |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |