Machine Studies
Draft Schedule for Run01-5, 2007
February 27th 0800 - February 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 2/27/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0830 |
Verify 352MHz source |
Horan |
No Beam |
0810-0900 |
Replace BO amplifier |
Yao |
No Impact |
0830-0900 |
Fill SR to 50 mA. |
OPS |
Stored Beam & Injection |
0900-1300 |
PEM studies for PC gun operation. |
Pasky |
Injection on request |
0900-1100 |
ID32 shielding verification with 50 mA. Parallel to PC gun PEM testing. |
Ramanathan |
Stored beam |
1100-1200 |
Switch to machine physics mode PEM testing. Parallel to PC gun PEM testing. |
Shang Schroeder |
Stored beam |
1200-1300 |
Reboot PSS iocs. |
Smith |
Stored beam |
1300-1600 |
Recover orbit for 324 bunches. |
Singh |
Stored Beam & Injection |
1300-1600 |
PAR BPM work. Parallel to orbit work. |
Yao Erwin |
Injection possible |
1600-1700 |
Single gap scan PEM testing. |
Shang Schroeder |
Stored Beam & Injection |
1700-1900 |
24BM steering. |
Singh Hahne |
Stored Beam & Injection |
1900-2100 |
Xbpm calibration. |
Hahne |
Stored Beam & Injection |
2100-2400 |
Continue reference lattice work. |
Emery Sajaev |
Stored Beam & Injection |
|
Wednesday, 2/28/07 |
|
|
0000-0400 |
CPU work. |
Emery |
Stored Beam & Injection |
0400-0630 |
Test single matrix controllaw for K1 and K2 down modes. |
Sereno Pasky |
Injection on request |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |