Draft Schedule for Run01-7, 2007
March 20th 0800 - March 21st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 3/20/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Repair RF rad monitor |
RF group |
No Beam |
0810-1000 |
Swap out S29BQ2, S29AQ4 and S34AQ2 |
Puttkammer |
No Beam |
0810-1000 |
Test AFG100 Driver patch |
Fors |
No Injection |
1000-1300 |
3 hrs SR console test |
Poncin |
Stored beam & Injection. No parallel studies |
1300 |
Inject 100 mA. |
OPS |
|
1300-1600 |
Test CTR diagnostics in the linac. |
Sereno |
No Injection |
1300-1500 |
S1/S3 bpm tests. Parallel to CTR diagnostics study. |
Singh Sun |
Stored beam |
1600 |
Inject 100 mA. |
OPS |
|
1600-1900 |
Linac study. |
Pasky Shang |
No Injection |
1500-1900 |
ID gap feedforward. Parallel to CTR and linac study. |
Emery |
Stored beam |
1600-1700 |
Regression test of booster main ramped supply. Parallel to linac and SR studies. |
Sereno |
No beam required |
1900-2100 |
Fix orbit in S35 for pinhole alignment. |
Emery Sajaev |
Stored Beam & Injection |
2100-2200 |
Align BM pinhole camera. |
Yang |
Stored Beam & Injection |
2200-2400 |
P0 feedback drive test. |
Yao |
Stored Beam & Injection |
|
Wednesday, 3/21/07 |
|
|
0000-0300 |
Setup hybrid for symmetric lattice. |
Sajaev |
Stored Beam & Injection |
0300-0700 |
Measure tune slope in All ID RHB lattice. |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |