Machine Studies
Draft Schedule for Run01-9, 2007
March 27th 0800 - March 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 3/27/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
SR PEM testing |
Soliday |
No Beam |
0810-0830 |
Switch from pump 402 to 401 |
Ferry |
No Beam |
0810-0900 |
7ID PSS end to end test |
Forrestal |
No Beam |
0810-0900 |
Testing of AFG100 Driver Patch for Booster Dipole |
Fors, Lenkszus |
No Injection |
0810-0900 |
Reboot CPU IOC |
Smith |
No Beam |
0830-0930 |
Map removal of 11ID EMW |
Grimmer |
Access Zone B |
0810-1200 |
IK1 power supply work. |
PS group |
No beam |
1200-1230 |
Recover Storage Ring |
OPS |
Stored Beam & Injection |
1230-1430 |
Gap scan PEM testing. Last 30 minutes parallel to PC gun study – no injection. |
Decker Shang |
Stored Beam & Injection |
1400-1800 |
PC gun study. |
Sereno |
No injection |
1430-1800 |
BPM tests. Parallel to PC gun study. |
Singh |
Stored beam |
1800-1900 |
Investigation of elevated S34 ion pump reading. |
Schroeder |
Stored Beam & Injection |
1900-2300 |
ID xbpm alignment. |
Decker Hahne |
Stored Beam & Injection |
2300-2400 |
Setup hybrid lattice. |
Emery Sajaev |
Stored Beam & Injection |
|
Wednesday, 3/28/07 |
|
|
0000-0500 |
Setup hybrid lattice (continued). |
Emery Sajaev |
Stored Beam & Injection |
0500-0700 |
Measure tune slope in All ID RHB lattice. |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |