Draft Schedule for Run02-1, 2007
May 22nd 0800 – May30th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 5/22/07 |
|
|
0800-1000 |
SR dc/ac orbit control/configuration tests (at least 30mA) |
emery/ lenkszus/ shang |
Stored Beam |
1000-1400 |
Preliminary orbit recovery (102mA) |
Emery |
Stored Beam |
1400-1800 |
mpbpm tests (at least 30mA) |
Erwin/Keane |
Stored beam |
1800-2100 |
Preliminary setup of 35BM pinhole camera |
Yang |
Stored beam |
2100-2400 |
Measure and correct beta functions |
Sajaev |
Stored beam & inj. |
|
Wednesday, 5/23/07 |
|
|
0000-0100 |
Measure and correct beta functions |
Sajaev |
Stored beam & inj. |
0100-0500 |
Measure sextupole offsets. |
Sajaev |
Stored beam & inj. |
0500-0700 |
Test rms calculation software |
Lenkszus |
Stored beam |
0700-0900 |
nbbpm tests (all gaps open) |
Sun |
Stored beam |
0900-1100 |
bm xbpm tests (all gaps open) |
Hahne |
Stored beam |
1100-1500 |
measure P1 bpm offsets; Validate BPLDs |
Bui |
Stored beam & Inj. |
1500-1800 |
Setup corrector FF for datapool |
Emery |
Stored beam & inj. |
1800-1900 |
Check CPU operation in DC and AC modes |
Emery |
Stored beam |
1900-2400 |
LCLS |
Pasky, Lill, Erwin |
No injection |
|
Thursday, 5/24/07 |
|
|
0000-0600 |
Run top-up – tune injectors |
OPS |
Stored beam & inj. |
0600-1000 |
ID Xbpm tests |
Hahne |
Stored beam & Inj. |
1000-1600 |
Tune slope measurement with reduced beta function |
Sajaev |
Stored beam & inj. |
1600-2200 |
Test lattice for RF deflection |
Emery/ Sajaev |
Stored beam & Inj. |
2200-2400 |
measure coherent damping in x- and y-plane as a function of chromaticity. (in connection with HOM damper design of deflecting cavity. |
Emery |
Stored beam & inj. |
|
Friday, 5/25/07 |
|
|
0000-0100 |
measure coherent damping in x- and y-plane as a function of chromaticity. |
Emery |
Stored beam & inj. |
0100-0600 |
OPEN |
|
|
0600-1200 |
LCLS testing |
Pasky, Lill, Erwin |
No injection |
0800-1600 |
PSS validations / end to end tests |
SI group |
No Beam |
0800-0900 |
Replace back-up RF source generator |
Moser |
No Beam |
0800-0900 |
Replace RF2 TCU |
Horan |
No Beam |
0900-1100 |
Waveguide switch |
RF Group |
No Beam |
0800-1100 |
Access to repair RF Cav38 Cav#2 US thermocouple |
Morrison |
Zone F Access |
1100-1200 |
MPS Validate RF3 & RF4 |
Arnold/Flood |
No beam |
1600-2000 |
Reference lattice work |
Sajaev/Emery |
Stored beam & inj. |
2000-2400 |
Setup 16mA single bunch |
Emery/ Sajaev |
Stored beam & inj. |
|
Saturday, 5/26/07 |
|
|
0000-0200 |
Setup 16mA single bunch |
Emery/ Sajaev |
Stored beam & inj. |
0200-1400 |
OPEN |
|
|
1400-2000 |
Re-establish 35BM imaging of transient chirped single bunch using vertical pinger. |
Harkay / Yang |
Stored beam & injection |
2000-2400 |
Measure growth rates of multibunch instabilities (standard bunch pattern |
Harkay |
Stored beam & inj. |
|
Sunday 5/27/07 |
|
|
0000-0200 |
Measure growth rates of multibunch instabilities (standard bunch pattern |
Harkay |
Stored beam & inj. |
0200-0800 |
OPEN |
|
|
0800-1600 |
orbit recovery 24 bunch top-up |
Decker |
Stored beam & Inj. |
1600-2400 |
OPEN |
|
|
|
Monday 5/28/07 |
|
|
0000-1000 |
Top-up – injector tune-up |
OPS |
Stored beam &inj. |
1000-1600 |
bpm tests |
singh |
Stored beam |
1600-2400 |
Xbpm system checkout 24 bunch top-up |
Decker |
Stored beam & inj. |
|
Tuesday 5/29/07 |
|
|
0000-0600 |
OPEN |
|
|
0600-1000 |
test new rms configuration |
Lenkszus/ singh |
Stored beam |
1000-1400 |
xbpm orbit configuration tests |
Singh |
Stored beam |
1400-1800 |
Set-up bunch purity monitor and 35BM pinhole camera for user run (24 singlets) |
Yang |
Stored beam & inj. |
1800-2100 |
Characterize lattice |
Emery/ Sajaev |
Stored beam & inj. |
2100-2400 |
Reference lattice work |
Emery/ Sajaev |
Stored beam & inj. |
|
Wednesday 5/30/07 |
|
|
000-0100 |
Reference lattice work |
Emery/ Sajaev |
Stored beam & inj. |
0100-0400 |
Final CPU adjustments |
Emery |
Stored beam & inj. |
0400-0600 |
OPEN |
|
|
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Inj. |