Machine Studies
Schedule for Run02-3, 2007
June 12th 0800 - June 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 6/12/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0830 |
Reboot ctlapps3l |
Smith/Sheehan |
Limited Injection |
0810-0830 |
Reboot iocs19fb |
Lenkszus |
|
0810-0900 |
Replace LAN-GPIB box for iocbvp2 |
Varotto |
No Beam |
0810-1000 |
Measure CPU input & output current |
Deriy |
|
0810-1000 |
Replace output filter capacitors in S:BM |
Puttkammer |
No Beam |
0810-1000 |
Measure bus work for S:BM breaker replacement |
Fors |
No Beam |
0810-1000 |
Install new timing module in iocmtime |
Lenkszus/Laird |
No Beam/No Injection |
0810-1000 |
Replace Bldg. 420 temperature & humidity meters/probes with calibrated units |
Bromberek |
No impact |
0830-0930 |
make a list of narrow band bpm serial number around the Storage-ring |
Sun, Xiang |
No impact |
0830-1200 |
PCGun switchover PEM testing |
Sereno/Pasky |
Limited Injection |
0900-1000 |
Thermal scan of B:BM:M and B:BM:S contactor |
Puttkammer |
No injection |
0900-1200 |
Replace Booster corrector B2C4V converter |
Donkers |
No injection |
1000-1130 |
Investigate L2 drive errors |
Grelick |
Limited Injection |
1000-1100 |
Test solid state K1 relay replacement |
Deriy |
No beam |
1000-1200 |
PSG script testing |
Fors |
No Beam |
1200-1500 |
RMS calculation test |
Singh/Lenkzsus |
Stored Beam & Top-Up |
1500-1700 |
Optimize xbpm blade gains |
Decker/Singh |
Stored Beam & Inj. |
1700-2000 |
Various hybrid mode bunch patterns (RF turbo pumps needed) |
Emery/Harkay |
Stored Beam & Inj. |
2000-2300 |
Coherent damping measurement |
Emery/Harkay |
Stored Beam & Inj. |
2300-2400 |
Setup hybrid |
Emery/Sajaev |
Stored Beam & Inj. |
|
Wednesday, 6/13/07 |
|
|
0000-0300 |
Setup hybrid |
Emery/Sajaev |
Stored Beam & Inj. |
0300-0700 |
Test deflecting cavity lattice |
Emery/Sajaev |
Stored Beam & Inj. |
0700-0800 |
Prepare for User beam (0+24*1 Top-Up) |
OPS |
Stored Beam & Injection |