Machine Studies

Schedule for Run02-3, 2007

June 12th 0800 - June 13th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 6/12/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0830

Reboot ctlapps3l

Smith/Sheehan

Limited Injection

0810-0830

Reboot iocs19fb

Lenkszus


0810-0900

Replace LAN-GPIB box for iocbvp2

Varotto

No Beam

0810-1000

Measure CPU input & output current

Deriy


0810-1000

Replace output filter capacitors in S:BM

Puttkammer

No Beam

0810-1000

Measure bus work for S:BM breaker replacement

Fors

No Beam

0810-1000

Install new timing module in iocmtime

Lenkszus/Laird

No Beam/No Injection

0810-1000

Replace Bldg. 420 temperature & humidity meters/probes with calibrated units

Bromberek

No impact

0830-0930

make a list of narrow band bpm serial number around the Storage-ring

Sun, Xiang

No impact

0830-1200

PCGun switchover PEM testing

Sereno/Pasky

Limited Injection

0900-1000

Thermal scan of B:BM:M and B:BM:S contactor

Puttkammer

No injection

0900-1200

Replace Booster corrector B2C4V converter

Donkers

No injection

1000-1130

Investigate L2 drive errors

Grelick

Limited Injection

1000-1100

Test solid state K1 relay replacement

Deriy

No beam

1000-1200

PSG script testing

Fors

No Beam

1200-1500

RMS calculation test

Singh/Lenkzsus

Stored Beam & Top-Up

1500-1700

Optimize xbpm blade gains

Decker/Singh

Stored Beam & Inj.

1700-2000

Various hybrid mode bunch patterns (RF turbo pumps needed)

Emery/Harkay

Stored Beam & Inj.

2000-2300

Coherent damping measurement

Emery/Harkay

Stored Beam & Inj.

2300-2400

Setup hybrid

Emery/Sajaev

Stored Beam & Inj.


Wednesday, 6/13/07



0000-0300

Setup hybrid

Emery/Sajaev

Stored Beam & Inj.

0300-0700

Test deflecting cavity lattice

Emery/Sajaev

Stored Beam & Inj.

0700-0800

Prepare for User beam (0+24*1 Top-Up)

OPS

Stored Beam & Injection