Machine Studies

Schedule for Run02-7, 2007

July 10th 0800 – July 11th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 7/10/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Investigate S21C:BM:PS problem

PS Group

No beam

0810-1000

Replace 2 Z-line power strips in Rack 03-02

Controls Group

No beam

0810-1000

Further investigate PAR RF problems which occurred on 7/6

RF Group

No injection

0810-0900

Investigate RF2 13.2kV metering problem

RF Group

No beam

0810-1000

Replace PSCU Bitbus and/or fiber repeater card in S25 P.S. Cabinet #2

PS Group

No beam

0810-1000

Test canted undulator corrector P.S. limit

PS Group

No beam

0900-1000

Correct RF2 phase loop unlocking after beam loss

RF Group

No beam

1000-1100

Verify changes to RF2 phase loop

RF Group

Stored beam & Inj.

1100-1300

Switch rms calculation from P1 to P0 for operations

Singh/ Lenkszus/ Shang/Emery

Stored beam & Inj.

1300-1400

Try to reproduce the FB block not working

Lenkszus/ Emery

Stored beam & Inj.

1400-1700

CPU normal quad and skew quad correction in AC mode (possibly with 23-ID)

Emery

Stored beam

1700-2000

Reference lattice with new sextupole beam offsets

Emery

Stored beam & inj.

2000-2200

Multibunch instabilities

Harkay

Stored beam & injection

2200-2400

Perform tune vs. current scan

Sajaev

Stored beam & Inj.


Wednesday, 7/11/07



0000-0130

Perform tune vs. current scan

Sajaev

Stored beam & inj.

0130-0500

Test rf deflection lattice

Sajaev/Emery

Stored beam & Inj.

0500-0700

Benchmark S4 and S12 Cerenkov detectors for beam losses

Dooling/ Emery

Stored beam & Inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection