Machine Studies
Schedule for Run02-9, 2007
July 24th 0800 - July 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 7/24/07 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
S38 BPM work |
Erwin/Keane |
No Beam |
0810-0900 |
SR pump switchovers |
Ferry |
No Beam |
0810-1000 |
Measure temp and flow in S32 PS |
Puttkammer |
No Beam |
0810-1000 |
CMPSI fiber output testing |
Pietryla |
No Beam |
0830-0900 |
Verify stripline cable connections |
Yao, Gold |
Access Booster |
1000-1200 |
FO and Cerenkov beam loss monitor study |
Yao, Dooling |
Stored beam & inj. |
1200-1400 |
Test booster tune drive pulse supply |
Yao, Wang |
Occ. injection possible |
1200-1400 |
S38 BPM tests |
Erwin/Keane |
Stored beam |
1400-2100 |
LCLS testing |
Erwin/Pasky/ Sereno |
No beam available |
1400-1700 |
Test 32ID Xbpms (parasitic) |
Singh/Hahne |
Stored beam |
2100-2400 |
S32 RHB lattice setup |
Sajaev, Xiao |
Stored beam & injection |
|
Wednesday, 7/25/07 |
|
|
0000-0100 |
S32RHB lattice setup |
Sajaev, Xiao |
Stored beam & injection |
0100-0500 |
Crab-S7 lattice test |
Sajaev |
Stored beam & inj. |
0500-0700 |
X-ray BPM Gap Scans |
Decker |
Stored Beam & Inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |