Machine Studies

Draft Schedule for Run03-1, 2007

September 25 0800 – October 2 0800

Time

Descriptions

Studiers

SR Status

 

Monday, 9/24/07

 

 

1000-1300

First injection and preliminary orbit. recovery

Emery Sajaev OPS

Stored beam & injection

1300-2400

RF conditioning.

OPS

Stored beam & injection

 

Tuesday, 9/25/07

 

 

0000-1600

RF conditioning (continued).

OPS

Stored beam & injection

1000-1200

Initial S35B:M pinhole camera setup. Parallel to RF conditioning.

Yang

Stored beam & injection

1500-1800

CPU checkout. Part of it parallel to RF conditioning.

Emery

Stored beam & injection

1800-2000

BM xbpm and rf bpm checkout.

Hahne

Erwin

Stored beam & injection

2000-2400

BPLD validation.

Bui

Brill

Stored beam & injection

 

Wednesday, 9/26/07

 

 

0000-0100

BPLD validation (continued).

Bui Brill

Stored beam & injection

0100-0300

Collect RTFB data.

Sun

Stored beam & injection

0300-0500

OPEN

 

 

0500-0700

Investigate temperature sensor in S4B:V1 and back-flush S22:23 R1.

Puttkammer

NO BEAM

0700-1100

ID xbpm checkout.

Hahne

Stored beam & injection

1100-1900

Initial orbit recovery. Top-up 24 and 324 patterns.

Decker

Sajaev

Stored beam & injection

1900-2400

OPEN

 

 

 

Thursday, 9/27/07

 

 

0000-0300

Reference lattice work.

Emery

Sajaev

Stored beam & injection

0300-0600

Setup corrector FF for datapool.

Emery

Stored beam & injection

0600-1000

Linac PEM validation.

Pasky

No injection

1000-1100

Verify orbit controllaw PV test.

Shang

Stored beam & injection

1100-1500

P0 feedback study.

Yao

DiMonti

Stored beam & injection

1500-1900

Booster tune measurement test.

Yao Gold

Feng

Stored beam & injection

1900-2400

1ID, 2ID, and 23ID xbpm commissioning.

Decker

Stored beam & injection

 

Friday, 9/28/07

 

 

0000-0300

1ID, 2ID, and 23ID xbpm commissioning (continued).

Decker

Stored beam & injection

0300-0800

Beta function correction.

Sajaev

Xiao

Stored beam & injection

0800-1200

End to end shutter test.

SI group

No Beam

1000-1100

Waveguide switch. Parallel to shutter test.

RF group

No Beam

1200-1800

Multibunch instability study 1.

Harkay

Stored beam & injection

1800-2200

Try new fill patterns.

Emery

Harkay

Stored beam & injection

2200-2400

CPU checkout.

Emery

Stored beam & injection

 

Saturday, 9/29/07

 

 

0000-0100

CPU checkout (continued).

Emery

Stored beam & injection

0100-0300

PEM testing with beam.

OPS

Stored beam & injection

0300-1000

OPEN

 

 

1000-1600

Multibunch instability study 2.

Harkay

Yang

Stored beam & injection

1600-2400

OPEN

 

 

 

Sunday 9/30/07

 

 

0000-0600

Top-up operational readiness verification.

OPS

Stored beam & injection

0600-0900

OPEN

 

 

0900-1300

Test new FO beam loss detector at S9.

Yao

Dooling

Stored beam & injection

1300-1700

RTFB, datapool functional checkout.

Decker

Stored beam & injection

1700-2400

OPEN

 

 

 

Monday 10/01/07

 

 

0000-0300

OPEN

 

 

0300-0600

Bunch purity monitor system setup.

Yang

Stored beam & injection

0600-0800

Final S35B:M pinhole camera setup.

Yang

Stored beam & injection

0800-1600

Final orbit, xbpm scripts testing. With 30 min. pause for waveguide switch around 1000.

Decker

Schroeder

Stored beam & injection

Around 1000

Waveguide switch. Exact time upon agreement with G. Decker.

RF group

NO BEAM

1600-1900

Sextupole measurements with beam.

Emery

Sajaev

Stored beam & injection

1900-2200

Setup 16 mA single bunch.

Emery

Sajaev

Stored beam & injection

2200-2400

Optimize injection.

Emery

Sajaev

Stored beam & injection

 

Tuesday 10/02/07

 

 

0000-0200

Optimize injection (continued).

Emery

Sajaev

Stored beam & injection

0200-0600

Model measurement.

Sajaev

Stored beam & injection

0600-0800

Prepare for user Operations (24 singlets, Top-Up, S32 RHB)

OPS

Stored Beam & Injection