Machine Studies

Schedule for Run03-7, 2007

November 12th 0800 – November 14th 0800



Time

Descriptions

Studiers

SR Status

 

Monday, 11/12/07

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-0930

Reboot interleaving PS DSPs

Fors

No Injection

0900-1100

Swap out SR kicker Maxwell HVPS

PS group

No Beam

0900-1100

Test smart interface board

Fors

No Beam

0900-1100

Measure CPU output corrector coils

Puttkammer

No Beam

0900-1100

NRTL upgrade/repair in HET relay rack

PS group

No Beam

0900-1100

Measure S:BM AC input bus

Puttkammer

No Beam

0900-1300

PAR water RF studies

Pasky

Limited injection after 11:00

0900-1300

Investigate B-A phase problem/ waveguide switch to RF-2

Horan

No Beam

0930-1000

Troubleshoot stripline connections

Yao, Gold

Access Zone A

1100-1300

New operator training Linac

Fystro/Karl

Limited Injection

1100-1300

CPU fault cross training

PS group

No Beam

1300-1600

P0 feedback study.

Yao

Stored Beam & Injection

1600-1900

Bunch purity pattern from PAR study.

Yang Yao

Stored Beam & Injection

1900-2300

Single bunch limit vs betatron kick study.

Emery Harkay

Stored Beam & Injection

2300-2400

Beam loss monitor study.

Dooling Yao Yang

Stored Beam & Injection

 

Tuesday, 11/13/07

 

 

0000-0100

Beam loss monitor study (continued).

Dooling Yao Yang

Stored Beam & Injection

0100-0500

Xbpm characterization.

Decker

Stored Beam & Injection

0500-0700

Bucket to bucket diffusion study.

Yang

Stored Beam & Injection

0700-0900

Operator training Linac

Fystro/Karl

Limited Injection

0900-1200

PC gun phase controllaw testing.

Sereno

Limited Injection

1200-1400

Test SR PEM.

Schroeder Shang

Stored Beam & Injection

1400-1700

Bunch length and spectrum measurement.

Chae Yao Yang

Stored Beam & Injection

1700-2000

Test SR-SourceID script.

Decker Shang

Stored Beam & Injection

2000-2300

Investigate orbit noise in high charge bunch train.

Emery Sajaev

Stored Beam & Injection

2300-2400

Test kicker knob.

Emery Sajaev

Stored Beam & Injection

 

Wednesday, 11/14/07

 

 

0000-0100

Test kicker knob (continued).

Emery Sajaev

Stored Beam & Injection

0100-0400

Injection tuning for 24 singlets lattice.

Emery Sajaev

Stored Beam & Injection

0400-0700

OPEN

 

 

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection