Machine Studies
Schedule for Run03-9, 2007
November 27th 0800 – November 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 11/27/07 |
|
|
0800-0810 |
Collect Xbpm orbit data. |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap scans and update look-up tables. |
Schroeder/OPS |
Stored Beam & Injection |
0900-1300 |
High pressure steam leak repair in bldg. 450. No temperature control in the tunnel. |
FMS |
No beam |
0900-0930 |
Reboot iocruncontroll2. |
Xu, S |
No beam |
0900-1000 |
Swap S16B:S2, S17B:S3, S20B:Q2, and S21B:Q3. |
PS group |
No beam |
0900-1100 |
Thermal scan zone E PS. |
Puttkammer |
No beam |
0900-1100 |
Linac - Operator training |
Fystro/Karl |
Limited injection |
1100-1300 |
Test linac conditioning validity bit. |
Shang |
No injection |
1100-1300 |
Check SR conditioning validity PVs. |
Emery |
No beam |
1300-1500 |
Ensure hybrid bunch pattern operation. |
Emery Sajaev |
Stored Beam & Injection |
1500-1800 |
SourceID software tests. |
Decker Shang |
Stored Beam & Injection |
1800-2200 |
Orbit recovery for hybrid. |
Decker |
Stored Beam & Injection |
2200-2400 |
P0 feedback tests. |
Yao |
SourceID software tests. |
|
Wednesday, 11/28/07 |
|
|
0000-0100 |
P0 feedback tests (continued). |
Yao |
Stored Beam & Injection |
0100-0600 |
Test S7 crab cavity lattice. |
Sajaev |
Stored Beam & Injection |
0600-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |