Schedule for Run03-9, 2007

November 27th 0800 – November 28th 0800



Time

Descriptions

Studiers

SR Status

 

Tuesday, 11/27/07

 

 

0800-0810

Collect Xbpm orbit data.

OPS

Stored Beam & Injection

0810-0900

Gap scans and update look-up tables.

Schroeder/OPS

Stored Beam & Injection

0900-1300

High pressure steam leak repair in bldg. 450. No temperature control in the tunnel.

FMS

No beam

0900-0930

Reboot iocruncontroll2.

Xu, S

No beam

0900-1000

Swap S16B:S2, S17B:S3, S20B:Q2, and S21B:Q3.

PS group

No beam

0900-1100

Thermal scan zone E PS.

Puttkammer

No beam

0900-1100

Linac - Operator training

Fystro/Karl

Limited injection

1100-1300

Test linac conditioning validity bit.

Shang

No injection

1100-1300

Check SR conditioning validity PVs.

Emery

No beam

1300-1500

Ensure hybrid bunch pattern operation.

Emery Sajaev

Stored Beam & Injection

1500-1800

SourceID software tests.

Decker Shang

Stored Beam & Injection

1800-2200

Orbit recovery for hybrid.

Decker

Stored Beam & Injection

2200-2400

P0 feedback tests.

Yao

SourceID software tests.

 

Wednesday, 11/28/07

 

 

0000-0100

P0 feedback tests (continued).

Yao

Stored Beam & Injection

0100-0600

Test S7 crab cavity lattice.

Sajaev

Stored Beam & Injection

0600-0800

Prepare for User beam

OPS

Stored Beam & Injection