Schedule for Run01-1, 2007

January 22nd 0800 – January 29th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, 1/22/08



0800-1000

BM Photon BPM commissioning

Hahne

Stored beam & Occ. Inj.

0800-1000

Linac Operator Training

Fystro

Limited Inj.

1000-1400

Pinhole camera commissioning (>40mA)

Yang

Stored beam

1000-1200

Linac Operator Training

Karl

Occ. Inj. possible

1200-1400

PAR Operator Training

Jones, Yao, Sereno, Pasky

Limited Inj.

1400-1800

Preliminary BPM checkout

Decker/Schroeder

Stored beam & Occ. Inj.

1400-1800

BPLD Validations

Bui

Stored beam & Inj.

1800-2100

CPU checkout DC Mode

Emery, Xiao

Stored beam & Inj.

2100-2400

BPM Offset measurements

OPS

Stored beam & Inj.


Wednesday, 1/23/08



0000-0700

BPM Offset measurements

OPS

Stored beam & Inj.

0700-0900

Operator Training

Fystro

Limited Injection

0700-0800

Investigate RMS motion readbacks (may require reboot of IOCS40fb)

Lenkszus

Limited impact

0800-0900

Verify 11-ID and 12-ID User control of device

M. Smith

No impact

0900-1500

Initial Orbit Recovery (Top-up)

Decker, Emery, Sajaev

Stored beam & Inj.

1300-1500

Calibrate new B-A phase system (phase adjustment readback may be periodically unavailable) (Top-Up)

RF Group

Stored beam & Inj.

1100-1500

Booster Tune Measurements

Yao

Booster Inj. needed No SR impact

1500-1900

PAR 12th Harmonic Checkout

Yao, T.Smith


1900-2100

Beam loss monitor test (pinger on, tune adjustment available)

Yao

Stored Beam & Inj.

2100-2400

Verify injection to 16mA in single bunch

Sajaev, Emery

Stored beam & Inj.


Thursday, 1/24/08



0000-0100

Verify injection to 16mA in single bunch

Sajaev, Emery

Stored beam & Inj.

0100-0700

Measure and correct Beta functions and test LOCO program

Sajaev

Stored beam & Inj.

0700-0900

Operator training

Karl

Limited Inj.

0800-1200

Investigate B-A phase out of range problem/waveguide switch

RF Group

No Beam

0800-0830

Switch pump 508 to 507 and pump 512-511

MOM Group

No impact

0800-1200

Tune control loop for new temperature control valve in process water system P-SR-08

Swetin

No Impact on scheduled studies

0800-0900

Prepare for Access

OPS

No Beam

0800-1200

PSS shutter checkouts

SI group

No Beam

0900-1100

Investigate/repair 24-ID PS1 shutter limit switches

SI group/MOM Group

Access Zone E

1000-1200

Test Bunch cleaning software & set-up bunch cleaning

Yao

Limited injection

1100-1200

Recover from Access

OPS

No beam

1200-1600

Shielding verification 16-ID (requires shutter permit – 1 hr 10-20mA 3 hrs 30-50mA)

Ramanathan, Ops

Stored beam & Occasional Inj.

1300-1500

Booster Training

Jones, Yao, Sereno, Pasky

No injection

1500-1800

Linac PEM tool testing

Pasky

No injection

1600-1800

SR script/PEM testing

Schroeder

Stored beam & Occ. Inj.

1800-2100

Test conditioning validity PV

Emery, Xu

No Beam

2100-2400

CPU Checkout AC Mode

Emery, Xiao

Stored beam


Friday, 1/25/08



0000-0630

BPM Offset Measurements

OPS

Stored beam & Inj.

0630-0730

Prepare for SR Access

OPS

No beam

0700-0900

Linac Operator training

Fystro

Limited injection

0730-0800

SR Access to investigate/repair possible water leak at S33B:Q4

Bechtold, Puttkammer

Zone E Access

0900-1500

Intermediate orbit recovery

Decker, Emery, Sajaev

Stored beam & Inj.

1500-1800

ID Gap Feedforward to Get Corrector Setpoints

Emery, Schroeder

Stored beam & Inj.

1800-2400

Multibunch Instability studies

Harkay

Stored beam & Injection


Saturday, 1/26/08



0000-0100

Multibunch Instability studies

Harkay

Stored beam & Injection

0600-1700

Vibrating Wire Monitor Test

Decker

Stored beam & Inj.

1100-1500

Investigate L5 RF

RF Group

Limited injection

1700-2100

32-ID beamline optics alignment (shutter permit needed – possibly top-up)

Jin Wang, OPS

Stored beam & Inj.

2100-2400

OPEN




Sunday 1/27/08



0000-0900

Operational Top-Up

Ops

Stored beam & Inj.

0900-1600

Alternate hybrid study with 32-ID

Harkay, 32-ID

Stored beam & Inj.

1600-2200

ID Photon BPM feedforward comissioning (top-up shutters closed)

Decker

Stored beam & Inj.

2200-2400

Set-up Bunch Purity measurements and Final Pinhole Camera Set-up

Yang

Stored beam & Inj.


Monday 1/28/08



0000-0200

Set-up Bunch Purity measurements and Final Pinhole Camera Set-up

Yang

Stored beam & Inj.

0200-0700

Operational Top-Up

OPS

Stored Beam & Inj.

0700-0900

Linac Operator Training

Karl

Limited Injection

0800-0900

RF waveguide switch

RF group

No beam

0830-1030

SR Operator Training

Schroeder, Sereno, Pasky

Stored Beam & Injection.

1100-1700

Alignment studies with 10ID, 11BM, 11ID (24 singlets, Top-Up, shutter permit needed)

Decker, Emery

Stored beam & Inj.

1700-2000

CPU Correction

Emery, Xiao

Stored beam & inj.

2000-2400

Test alternative hybrid with lower S1 sextupoles

Harkay, Emery, Sajaev

Stored beam & inj.


Tuesday 1/29/08



0000-0100

Test alternative hybrid with lower S1 sextupoles

Harkay, Emery, Sajaev

Stored beam & inj.

0100-0400

Measure SR Model

Sajaev

Stored beam & Inj.

0530-0600

Switch backup bunch current monitor to primary bunch current monitor (no top-up)

Lenkszus

Stored beam (No impact)

0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection