Machine Studies
Schedule for Run01-1, 2007
January 22nd 0800 – January 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 1/22/08 |
|
|
0800-1000 |
BM Photon BPM commissioning |
Hahne |
Stored beam & Occ. Inj. |
0800-1000 |
Linac Operator Training |
Fystro |
Limited Inj. |
1000-1400 |
Pinhole camera commissioning (>40mA) |
Yang |
Stored beam |
1000-1200 |
Linac Operator Training |
Karl |
Occ. Inj. possible |
1200-1400 |
PAR Operator Training |
Jones, Yao, Sereno, Pasky |
Limited Inj. |
1400-1800 |
Preliminary BPM checkout |
Decker/Schroeder |
Stored beam & Occ. Inj. |
1400-1800 |
BPLD Validations |
Bui |
Stored beam & Inj. |
1800-2100 |
CPU checkout DC Mode |
Emery, Xiao |
Stored beam & Inj. |
2100-2400 |
BPM Offset measurements |
OPS |
Stored beam & Inj. |
|
Wednesday, 1/23/08 |
|
|
0000-0700 |
BPM Offset measurements |
OPS |
Stored beam & Inj. |
0700-0900 |
Operator Training |
Fystro |
Limited Injection |
0700-0800 |
Investigate RMS motion readbacks (may require reboot of IOCS40fb) |
Lenkszus |
Limited impact |
0800-0900 |
Verify 11-ID and 12-ID User control of device |
M. Smith |
No impact |
0900-1500 |
Initial Orbit Recovery (Top-up) |
Decker, Emery, Sajaev |
Stored beam & Inj. |
1300-1500 |
Calibrate new B-A phase system (phase adjustment readback may be periodically unavailable) (Top-Up) |
RF Group |
Stored beam & Inj. |
1100-1500 |
Booster Tune Measurements |
Yao |
Booster Inj. needed No SR impact |
1500-1900 |
PAR 12th Harmonic Checkout |
Yao, T.Smith |
|
1900-2100 |
Beam loss monitor test (pinger on, tune adjustment available) |
Yao |
Stored Beam & Inj. |
2100-2400 |
Verify injection to 16mA in single bunch |
Sajaev, Emery |
Stored beam & Inj. |
|
Thursday, 1/24/08 |
|
|
0000-0100 |
Verify injection to 16mA in single bunch |
Sajaev, Emery |
Stored beam & Inj. |
0100-0700 |
Measure and correct Beta functions and test LOCO program |
Sajaev |
Stored beam & Inj. |
0700-0900 |
Operator training |
Karl |
Limited Inj. |
0800-1200 |
Investigate B-A phase out of range problem/waveguide switch |
RF Group |
No Beam |
0800-0830 |
Switch pump 508 to 507 and pump 512-511 |
MOM Group |
No impact |
0800-1200 |
Tune control loop for new temperature control valve in process water system P-SR-08 |
Swetin |
No Impact on scheduled studies |
0800-0900 |
Prepare for Access |
OPS |
No Beam |
0800-1200 |
PSS shutter checkouts |
SI group |
No Beam |
0900-1100 |
Investigate/repair 24-ID PS1 shutter limit switches |
SI group/MOM Group |
Access Zone E |
1000-1200 |
Test Bunch cleaning software & set-up bunch cleaning |
Yao |
Limited injection |
1100-1200 |
Recover from Access |
OPS |
No beam |
1200-1600 |
Shielding verification 16-ID (requires shutter permit – 1 hr 10-20mA 3 hrs 30-50mA) |
Ramanathan, Ops |
Stored beam & Occasional Inj. |
1300-1500 |
Booster Training |
Jones, Yao, Sereno, Pasky |
No injection |
1500-1800 |
Linac PEM tool testing |
Pasky |
No injection |
1600-1800 |
SR script/PEM testing |
Schroeder |
Stored beam & Occ. Inj. |
1800-2100 |
Test conditioning validity PV |
Emery, Xu |
No Beam |
2100-2400 |
CPU Checkout AC Mode |
Emery, Xiao |
Stored beam |
|
Friday, 1/25/08 |
|
|
0000-0630 |
BPM Offset Measurements |
OPS |
Stored beam & Inj. |
0630-0730 |
Prepare for SR Access |
OPS |
No beam |
0700-0900 |
Linac Operator training |
Fystro |
Limited injection |
0730-0800 |
SR Access to investigate/repair possible water leak at S33B:Q4 |
Bechtold, Puttkammer |
Zone E Access |
0900-1500 |
Intermediate orbit recovery |
Decker, Emery, Sajaev |
Stored beam & Inj. |
1500-1800 |
ID Gap Feedforward to Get Corrector Setpoints |
Emery, Schroeder |
Stored beam & Inj. |
1800-2400 |
Multibunch Instability studies |
Harkay |
Stored beam & Injection |
|
Saturday, 1/26/08 |
|
|
0000-0100 |
Multibunch Instability studies |
Harkay |
Stored beam & Injection |
0600-1700 |
Vibrating Wire Monitor Test |
Decker |
Stored beam & Inj. |
1100-1500 |
Investigate L5 RF |
RF Group |
Limited injection |
1700-2100 |
32-ID beamline optics alignment (shutter permit needed – possibly top-up) |
Jin Wang, OPS |
Stored beam & Inj. |
2100-2400 |
OPEN |
|
|
|
Sunday 1/27/08 |
|
|
0000-0900 |
Operational Top-Up |
Ops |
Stored beam & Inj. |
0900-1600 |
Alternate hybrid study with 32-ID |
Harkay, 32-ID |
Stored beam & Inj. |
1600-2200 |
ID Photon BPM feedforward comissioning (top-up shutters closed) |
Decker |
Stored beam & Inj. |
2200-2400 |
Set-up Bunch Purity measurements and Final Pinhole Camera Set-up |
Yang |
Stored beam & Inj. |
|
Monday 1/28/08 |
|
|
0000-0200 |
Set-up Bunch Purity measurements and Final Pinhole Camera Set-up |
Yang |
Stored beam & Inj. |
0200-0700 |
Operational Top-Up |
OPS |
Stored Beam & Inj. |
0700-0900 |
Linac Operator Training |
Karl |
Limited Injection |
0800-0900 |
RF waveguide switch |
RF group |
No beam |
0830-1030 |
SR Operator Training |
Schroeder, Sereno, Pasky |
Stored Beam & Injection. |
1100-1700 |
Alignment studies with 10ID, 11BM, 11ID (24 singlets, Top-Up, shutter permit needed) |
Decker, Emery |
Stored beam & Inj. |
1700-2000 |
CPU Correction |
Emery, Xiao |
Stored beam & inj. |
2000-2400 |
Test alternative hybrid with lower S1 sextupoles |
Harkay, Emery, Sajaev |
Stored beam & inj. |
|
Tuesday 1/29/08 |
|
|
0000-0100 |
Test alternative hybrid with lower S1 sextupoles |
Harkay, Emery, Sajaev |
Stored beam & inj. |
0100-0400 |
Measure SR Model |
Sajaev |
Stored beam & Inj. |
0530-0600 |
Switch backup bunch current monitor to primary bunch current monitor (no top-up) |
Lenkszus |
Stored beam (No impact) |
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |