Machine Studies
Schedule for Run01-10, 2008
April 8th 0800 – April 9th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 4/8/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
1100-1245 |
Operator training (09-15) |
Fystro |
Limited Injection |
1245-1430 |
Operator training (09-15) |
Karl |
Limited Injection |
0900-1000 |
Install a 117 Mhz clock module and reboot iocPARRF02 |
Grelick, Laird |
Limited Injection |
0900-1000 |
Swap VME board in iocs5bpm |
Yang |
No Beam |
0900-1100 |
SR converter tracking error measurements |
Fors |
No Beam |
0900-1100 |
Check SR kickers |
PS Group |
No Beam |
0900-1500 |
Install new thyratron in RG1 kicker |
Hillman |
No Effect until ~14:30 Limited injection 14:30-15:00 |
1100-1500 |
Calibration of Cerenkov detectors (80-100mA non-top up) |
Yang |
Occasional injection |
1500-1700 |
Switch to RHB lattice |
Emery |
Stored beam & injection |
1700-1900 |
Orbit recovery |
Decker/ Emery |
Stored beam & injection |
1900-2200 |
RTFB data collection |
Decker/Sun |
Stored beam & injection |
2100-2200 |
Connect timing signal from iocsrs1bpm and setup FPGA and S2 |
Yao |
No impact |
2200-2400 |
Test beam signal of P0 Feedback front-end (stored beam in singlet pattern) |
Decker/Yao |
Stored beam |
|
Wednesday, 4/9/08 |
|
|
0000-0200 |
Test beam signal of P0 Feedback front-end (stored beam in singlet pattern) |
Decker/Yao |
Stored beam |
0200-0630 |
CPU Compensation |
Xiao/Emery |
Stored beam |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |